APC Power Supply manual Electrical Requirements and Specifications, Electrical requirements

Page 16

Electrical Requirements and Specifications

Procedures requiring a licensed electrician

A licensed electrician must connect utility power. The following procedures require a licensed electrician:

connection of utility conductors

installation of a 200- or 100-amp circuit breaker

connection to the main input switch

connection to a branch circuit

To connect utility power, see the utility connection instructions included with your documentation.

See also

Electrical requirements

 

200V Input

415V Input

 

 

 

Service distribution breaker 1,2

200A

100A

Conductors to Main Input switch1

3W + G

3W + G

Recommended wire sizing2,3

 

 

L1, L2, L3

60mm2

38mm2

G

14 mm2

8 mm2

 

 

 

1Provided by customer

2Consult national and local codes for requirements specific to your installation.

3CV or CVT cable

8

InfraStruXure Site Planning, Installation, Start-Up

Image 16
Contents InfraStruXure Installation and Start-Up This manual is available in English on the enclosed CD About this Manual Page Contents Start-Up Procedure Configuration Page Safety Safety symbols used in this manualCross-reference symbols used in this manual OverviewInstallation/Maintenance Total power off procedureInput Voltage Circuit Breaker Size Register equipment with the fire departmentDimensions Site PreparationInfraStruXure PDU NetShelter VX Seismic EnclosureNetShelter VX Enclosure Space Considerations Weight Considerations Component Maximum Unpacked Maximum PackagedHeat Output InfraStruXure PDU Heat OutputElectrical Requirements and Specifications Procedures requiring a licensed electricianElectrical requirements 200V Input 415V InputBasic Installation Procedure Licensed electrician must connect the power source Installation Procedures Join Adjacent Enclosures and Bolt Enclosures to the FloorJoin adjacent enclosures Bolt Enclosures to the FloorEnsure Total Power Off Access the PDU Main Input switch Connect the Power Source to the PDUAttach conduit to the PDU for the input conductors Installation Procedures Connect the Power Source to the PDU Install a circuit breaker Route the input conductors to the main input circuit switchTorque specifications and tools required Terminal Torque ToolsConnect input conductors Output relay specifications OverviewHow to connect contacts to the PDU Monitoring Unit InfraStruXure Site Planning, Installation, Start-Up Cable Ladders for overhead wiring across rows Install InfraStruXure Rack-Mount Devices Install the Rack Automatic Transfer Switches ATSInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and Attach Overhead Wiring Route and attach power cables to equipment racksInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Alternative Installation Procedures Wiring Under the Floor Alternative Route Data Cables to the InfraStruXure Manager Hub or Switch Connect network cables to InfraStruXure componentsOverhead routing Safety warnings Start-Up ProcedureEnsure that all power is off Apply power to the system Start-Up Procedure InfraStruXure System Page Configuration Configure the InfraStruXure ManagerPage How to Apply Power to the System Appendix A-System OperationHow to Ensure Total Power Off Page APC Worldwide Customer Support