APC Power Supply manual Cable Ladders for overhead wiring across rows

Page 28

Installation Procedures: Install Shielding Troughs, Shielding Partitions, and Cable Ladders

Shielding Partitions. There are two types of Shielding Partitions, each of which forms a side wall of a trough for data cables. You can customize the width of the trough for each row of your system — wider for rows carrying many data cables, narrower for rows carrying fewer.

• As the back wall, use a Shielding Partition that contains an opening for routing data cables.

• As the front wall, use a solid Shielding Partition to hide data cables for a clean appearance.

Cable Ladders for overhead wiring across rows

After installing the Shielding Troughs and Shielding Partitions, install the Cable Ladders between rows of enclosures. You can also run Cable Ladders across Shielding Troughs in the same row, using the hardware provided in the ladder kit.

For more information on installing the Cable Ladders, see the instruction sheet included with the cable ladders (990-1576).

See also

Use wide Cable Ladders (305 mm) where many power cables or data cables will run between rows; use narrow Cable Ladders (152 mm) where few power cables or data cables will run between rows.

The Cable Ladders are 2946 millimeters long. You can adjust the length of the Cable Ladders in the following ways:

Cut the ends with a hacksaw to shorten them.

Insert the connectors only partially into the side rails to extend them.

Do not change the spacing between rows or the length and position of the Cable Ladders from the layout you planned with your APC representative when you placed your order. For overhead wiring, each PDU power cable is provided at a pre-determined length. Changes to the physical configuration of your system could cause some PDU power cables to be too short or too long.

20

InfraStruXure Site Planning, Installation, Start-Up

Image 28
Contents InfraStruXure Installation and Start-Up This manual is available in English on the enclosed CD About this Manual Page Contents Start-Up Procedure Configuration Page Safety Safety symbols used in this manualCross-reference symbols used in this manual OverviewInstallation/Maintenance Total power off procedureInput Voltage Circuit Breaker Size Register equipment with the fire departmentDimensions Site PreparationInfraStruXure PDU NetShelter VX Seismic EnclosureNetShelter VX Enclosure Space Considerations Weight Considerations Component Maximum Unpacked Maximum PackagedHeat Output InfraStruXure PDU Heat OutputElectrical Requirements and Specifications Procedures requiring a licensed electricianElectrical requirements 200V Input 415V InputBasic Installation Procedure Licensed electrician must connect the power source Installation Procedures Join Adjacent Enclosures and Bolt Enclosures to the FloorJoin adjacent enclosures Bolt Enclosures to the FloorEnsure Total Power Off Access the PDU Main Input switch Connect the Power Source to the PDUAttach conduit to the PDU for the input conductors Installation Procedures Connect the Power Source to the PDU Install a circuit breaker Route the input conductors to the main input circuit switchTorque specifications and tools required Terminal Torque ToolsConnect input conductors Output relay specifications OverviewHow to connect contacts to the PDU Monitoring Unit InfraStruXure Site Planning, Installation, Start-Up Cable Ladders for overhead wiring across rows Install InfraStruXure Rack-Mount Devices Install the Rack Automatic Transfer Switches ATSInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and Attach Overhead Wiring Route and attach power cables to equipment racksInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Alternative Installation Procedures Wiring Under the Floor Alternative Route Data Cables to the InfraStruXure Manager Hub or Switch Connect network cables to InfraStruXure componentsOverhead routing Safety warnings Start-Up ProcedureEnsure that all power is off Apply power to the system Start-Up Procedure InfraStruXure System Page Configuration Configure the InfraStruXure ManagerPage How to Apply Power to the System Appendix A-System OperationHow to Ensure Total Power Off Page APC Worldwide Customer Support