APC Power Supply manual Start-Up Procedure, Safety warnings, Ensure that all power is off

Page 37

Start-Up Procedure

Safety warnings

Only APC Field Service Engineers or qualified, APC-trained personnel may perform a system start-up.

Before you proceed, ensure that power is off by following the procedure in this section.

Ensure that all power is off

1. Open (turn OFF) the PDU main input.

2. Set the upstream input circuit breaker (utility or UPS) to the OFF or Locked Out position.

InfraStruXure Site Planning, Installation, Start-Up

29

Image 37
Contents InfraStruXure Installation and Start-Up This manual is available in English on the enclosed CD About this Manual Page Contents Start-Up Procedure Configuration Page Safety symbols used in this manual SafetyCross-reference symbols used in this manual OverviewTotal power off procedure Installation/MaintenanceInput Voltage Circuit Breaker Size Register equipment with the fire departmentSite Preparation DimensionsInfraStruXure PDU NetShelter VX Seismic EnclosureNetShelter VX Enclosure Space Considerations Component Maximum Unpacked Maximum Packaged Weight ConsiderationsInfraStruXure PDU Heat Output Heat OutputProcedures requiring a licensed electrician Electrical Requirements and SpecificationsElectrical requirements 200V Input 415V InputBasic Installation Procedure Licensed electrician must connect the power source Join Adjacent Enclosures and Bolt Enclosures to the Floor Installation ProceduresJoin adjacent enclosures Bolt Enclosures to the FloorEnsure Total Power Off Access the PDU Main Input switch Connect the Power Source to the PDUAttach conduit to the PDU for the input conductors Installation Procedures Connect the Power Source to the PDU Route the input conductors to the main input circuit switch Install a circuit breakerTorque specifications and tools required Terminal Torque ToolsConnect input conductors Overview Output relay specificationsHow to connect contacts to the PDU Monitoring Unit InfraStruXure Site Planning, Installation, Start-Up Cable Ladders for overhead wiring across rows Install the Rack Automatic Transfer Switches ATS Install InfraStruXure Rack-Mount DevicesInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and attach power cables to equipment racks Route and Attach Overhead WiringInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Alternative Installation Procedures Wiring Under the Floor Alternative Connect network cables to InfraStruXure components Route Data Cables to the InfraStruXure Manager Hub or SwitchOverhead routing Safety warnings Start-Up ProcedureEnsure that all power is off Apply power to the system Start-Up Procedure InfraStruXure System Page Configure the InfraStruXure Manager ConfigurationPage Appendix A-System Operation How to Apply Power to the SystemHow to Ensure Total Power Off Page APC Worldwide Customer Support