APC Power Supply manual Install InfraStruXure Rack-Mount Devices

Page 29

Install InfraStruXure Rack-Mount Devices

Install the Rack Automatic Transfer Switches (ATS)

Install a Rack ATS in the top of each enclosure for overhead wiring, and in the bottom of each enclosure for wiring under the floor.

See the installation instructions in the manual included with your Rack ATS.

See also

The Rack ATS is an optional component, and not all InfraStruXure systems will include it.

Install the Rack Power Distribution Units (PDU)

Install Rack PDUs in the rear of the NetShelter VX enclosure, in the channel directly behind the rear vertical mounting rails. For overhead wiring, make sure that the power cord is pointing toward the roof of the enclosure. For wiring under the floor, make sure that the power cord is pointing toward the floor.

See the installation instructions in the manual included with your Rack PDU.

See also

The Rack PDUs is an optional component, and not all InfraStruXure systems will include it.

Install the InfraStruXure Manager and Hub (or Switch)

Install the InfraStruXure Manager in the enclosure closest to the PDU. The CAT5 data cables included with your configuration are of varying lengths, based on the distance components will be installed from the PDU.

See the installation instructions in the manual included with your InfraStruXure Manager.

See also

Install the APC Environmental Monitoring Unit

Install the Environmental Monitoring Unit according to the installation instructions included with the device. The Environmental Monitoring Unit is an optional component, and not all InfraStruXure systems will include it.

InfraStruXure Site Planning, Installation, Start-Up

21

Image 29
Contents InfraStruXure Installation and Start-Up This manual is available in English on the enclosed CD About this Manual Page Contents Start-Up Procedure Configuration Page Safety symbols used in this manual SafetyCross-reference symbols used in this manual OverviewTotal power off procedure Installation/MaintenanceInput Voltage Circuit Breaker Size Register equipment with the fire departmentSite Preparation DimensionsInfraStruXure PDU NetShelter VX Seismic EnclosureNetShelter VX Enclosure Space Considerations Component Maximum Unpacked Maximum Packaged Weight ConsiderationsInfraStruXure PDU Heat Output Heat OutputProcedures requiring a licensed electrician Electrical Requirements and SpecificationsElectrical requirements 200V Input 415V InputBasic Installation Procedure Licensed electrician must connect the power source Join Adjacent Enclosures and Bolt Enclosures to the Floor Installation ProceduresJoin adjacent enclosures Bolt Enclosures to the FloorEnsure Total Power Off Attach conduit to the PDU for the input conductors Connect the Power Source to the PDUAccess the PDU Main Input switch Installation Procedures Connect the Power Source to the PDU Route the input conductors to the main input circuit switch Install a circuit breakerTorque specifications and tools required Terminal Torque ToolsConnect input conductors Overview Output relay specificationsHow to connect contacts to the PDU Monitoring Unit InfraStruXure Site Planning, Installation, Start-Up Cable Ladders for overhead wiring across rows Install the Rack Automatic Transfer Switches ATS Install InfraStruXure Rack-Mount DevicesInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and attach power cables to equipment racks Route and Attach Overhead WiringInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Alternative Installation Procedures Wiring Under the Floor Alternative Connect network cables to InfraStruXure components Route Data Cables to the InfraStruXure Manager Hub or SwitchOverhead routing Ensure that all power is off Start-Up ProcedureSafety warnings Apply power to the system Start-Up Procedure InfraStruXure System Page Configure the InfraStruXure Manager ConfigurationPage Appendix A-System Operation How to Apply Power to the SystemHow to Ensure Total Power Off Page APC Worldwide Customer Support