Basic Installation Procedure
This section provides the basic steps that you need to perform when installing InfraStruXure power and rack components. Follow the references provided with each step for detailed instructions.
Do not begin installing your InfraStruXure system without an APC Field Service Engineer present.
1.Unpack the components according to the unpacking instructions included on the outside of the packaging or in the installation manual included with the component.
Make sure that all boxes and packaging are empty before discarding them.
2.Determine the correct placement of your system components by studying your APC InfraStruXure
If installing InfraStruXure on a raised floor, make sure that the raised- floor structure has a kg/m2 rating that will support the full weight of the InfraStruXure installation. See “Weight Considerations” on page 6.
3. Join adjacent NetShelter enclosures.
For instructions on joining adjacent NetShelter VX Seismic Enclosures, see the installation manual included with your enclosures.
See also
4. Bolt enclosures to the floor.
See page 11 for detailed instructions.
5. Ensure total power off.
See page 12 for detailed instructions.
InfraStruXure Site Planning, Installation, | 9 |