Contents
InfraStruXure Installation and Start-Up
This manual is available in English on the enclosed CD
About this Manual
Page
Contents
Start-Up Procedure
Configuration
Page
Safety
Safety symbols used in this manual
Cross-reference symbols used in this manual
Overview
Installation/Maintenance
Total power off procedure
Input Voltage Circuit Breaker Size
Register equipment with the fire department
Dimensions
Site Preparation
InfraStruXure PDU
NetShelter VX Seismic Enclosure
NetShelter VX Enclosure
Space Considerations
Weight Considerations
Component Maximum Unpacked Maximum Packaged
Heat Output
InfraStruXure PDU Heat Output
Electrical Requirements and Specifications
Procedures requiring a licensed electrician
Electrical requirements
200V Input 415V Input
Basic Installation Procedure
Licensed electrician must connect the power source
Installation Procedures
Join Adjacent Enclosures and Bolt Enclosures to the Floor
Join adjacent enclosures
Bolt Enclosures to the Floor
Ensure Total Power Off
Access the PDU Main Input switch
Connect the Power Source to the PDU
Attach conduit to the PDU for the input conductors
Installation Procedures Connect the Power Source to the PDU
Install a circuit breaker
Route the input conductors to the main input circuit switch
Torque specifications and tools required
Terminal Torque Tools
Connect input conductors
Output relay specifications
Overview
How to connect contacts to the PDU Monitoring Unit
InfraStruXure Site Planning, Installation, Start-Up
Cable Ladders for overhead wiring across rows
Install InfraStruXure Rack-Mount Devices
Install the Rack Automatic Transfer Switches ATS
Install the Rack Power Distribution Units PDU
Install the InfraStruXure Manager and Hub or Switch
Route and Attach Overhead Wiring
Route and attach power cables to equipment racks
Installation Procedures Route and Attach Overhead Wiring
Installation Procedures Route and Attach Overhead Wiring
Wiring Under the Floor Alternative
Installation Procedures Wiring Under the Floor Alternative
Route Data Cables to the InfraStruXure Manager Hub or Switch
Connect network cables to InfraStruXure components
Overhead routing
Safety warnings
Start-Up Procedure
Ensure that all power is off
Apply power to the system
Start-Up Procedure InfraStruXure System
Page
Configuration
Configure the InfraStruXure Manager
Page
How to Apply Power to the System
Appendix A-System Operation
How to Ensure Total Power Off
Page
APC Worldwide Customer Support
Related pages
Troubleshooting Guide for BRK electronic GCO1B
Specifications for Lumex Syatems RJ4300G
Error Code and Error Status Names for Toshiba A10
Connection Diagram for VocoPro CDG X-3 Mark II
HOW to USE Programs Directly from OUR WEB Site for NordicTrack NTTL15510
Reinstalling Windows for Dell 2200
Parts List for Desa SVYD18N
Language Code List for Onkyo HTP-V10X
What is it? for Philips 190S1
safety Information for Samsung RS261MDPN
How do I set up the
Cateye CC-HB100
for optimal use?
Top
Page
Image
Contents