APC Power Supply Overview, Safety symbols used in this manual

Page 9

Safety

Overview

Save these instructions

This manual contains important instructions that must be followed during installation, operation, and maintenance of the InfraStruXure System.

Safety symbols used in this manual

Indicates an electrical hazard, which, if not avoided, could result in injury or death.

Indicates a hazard, which, if not avoided, could result in personal injury or damage to product or other property.

Indicates a potential hazard which could result in damage to product or other property.

Indicates important information.

Indicates a heavy load that should not be lifted without assistance.

Indicates a standby state. When in standby, the unit is not operating, but it may still contain hazardous voltage. It is not safe to service until the equipment is disconnected from all sources of electrical power.

Cross-reference symbols used in this manual

Indicates that more information is available on the same subject in a different manual.

See also

Indicates that more information is available on the same subject in a different section of this manual.

InfraStruXure Site Planning, Installation, Start-Up

1

Image 9
Contents InfraStruXure Installation and Start-Up This manual is available in English on the enclosed CD About this Manual Page Contents Start-Up Procedure Configuration Page Safety symbols used in this manual SafetyCross-reference symbols used in this manual OverviewTotal power off procedure Installation/MaintenanceInput Voltage Circuit Breaker Size Register equipment with the fire departmentSite Preparation DimensionsInfraStruXure PDU NetShelter VX Seismic EnclosureNetShelter VX Enclosure Space Considerations Component Maximum Unpacked Maximum Packaged Weight ConsiderationsInfraStruXure PDU Heat Output Heat OutputProcedures requiring a licensed electrician Electrical Requirements and SpecificationsElectrical requirements 200V Input 415V InputBasic Installation Procedure Licensed electrician must connect the power source Join Adjacent Enclosures and Bolt Enclosures to the Floor Installation ProceduresJoin adjacent enclosures Bolt Enclosures to the FloorEnsure Total Power Off Connect the Power Source to the PDU Access the PDU Main Input switchAttach conduit to the PDU for the input conductors Installation Procedures Connect the Power Source to the PDU Route the input conductors to the main input circuit switch Install a circuit breakerTorque specifications and tools required Terminal Torque ToolsConnect input conductors Overview Output relay specificationsHow to connect contacts to the PDU Monitoring Unit InfraStruXure Site Planning, Installation, Start-Up Cable Ladders for overhead wiring across rows Install the Rack Automatic Transfer Switches ATS Install InfraStruXure Rack-Mount DevicesInstall the Rack Power Distribution Units PDU Install the InfraStruXure Manager and Hub or SwitchRoute and attach power cables to equipment racks Route and Attach Overhead WiringInstallation Procedures Route and Attach Overhead Wiring Installation Procedures Route and Attach Overhead Wiring Wiring Under the Floor Alternative Installation Procedures Wiring Under the Floor Alternative Connect network cables to InfraStruXure components Route Data Cables to the InfraStruXure Manager Hub or SwitchOverhead routing Start-Up Procedure Safety warningsEnsure that all power is off Apply power to the system Start-Up Procedure InfraStruXure System Page Configure the InfraStruXure Manager ConfigurationPage Appendix A-System Operation How to Apply Power to the SystemHow to Ensure Total Power Off Page APC Worldwide Customer Support