APC
Power Supply
manual
Specs
Install
Dimension
Configuration
Start-Up Procedure
Weight
How to
Safety
Ensure Total Power Off
Page 40
Page 39
Page 41
Image 40
Page 39
Page 41
Contents
InfraStruXure Installation and Start-Up
This manual is available in English on the enclosed CD
About this Manual
Page
Contents
Start-Up Procedure
Configuration
Page
Safety
Safety symbols used in this manual
Cross-reference symbols used in this manual
Overview
Installation/Maintenance
Total power off procedure
Input Voltage Circuit Breaker Size
Register equipment with the fire department
Dimensions
Site Preparation
InfraStruXure PDU
NetShelter VX Seismic Enclosure
NetShelter VX Enclosure
Space Considerations
Weight Considerations
Component Maximum Unpacked Maximum Packaged
Heat Output
InfraStruXure PDU Heat Output
Electrical Requirements and Specifications
Procedures requiring a licensed electrician
Electrical requirements
200V Input 415V Input
Basic Installation Procedure
Licensed electrician must connect the power source
Installation Procedures
Join Adjacent Enclosures and Bolt Enclosures to the Floor
Join adjacent enclosures
Bolt Enclosures to the Floor
Ensure Total Power Off
Access the PDU Main Input switch
Connect the Power Source to the PDU
Attach conduit to the PDU for the input conductors
Installation Procedures Connect the Power Source to the PDU
Install a circuit breaker
Route the input conductors to the main input circuit switch
Torque specifications and tools required
Terminal Torque Tools
Connect input conductors
Output relay specifications
Overview
How to connect contacts to the PDU Monitoring Unit
InfraStruXure Site Planning, Installation, Start-Up
Cable Ladders for overhead wiring across rows
Install InfraStruXure Rack-Mount Devices
Install the Rack Automatic Transfer Switches ATS
Install the Rack Power Distribution Units PDU
Install the InfraStruXure Manager and Hub or Switch
Route and Attach Overhead Wiring
Route and attach power cables to equipment racks
Installation Procedures Route and Attach Overhead Wiring
Installation Procedures Route and Attach Overhead Wiring
Wiring Under the Floor Alternative
Installation Procedures Wiring Under the Floor Alternative
Route Data Cables to the InfraStruXure Manager Hub or Switch
Connect network cables to InfraStruXure components
Overhead routing
Safety warnings
Start-Up Procedure
Ensure that all power is off
Apply power to the system
Start-Up Procedure InfraStruXure System
Page
Configuration
Configure the InfraStruXure Manager
Page
How to Apply Power to the System
Appendix A-System Operation
How to Ensure Total Power Off
Page
APC Worldwide Customer Support
Related pages
Typing troubleshooting for Blackberry 8830
Specification for Uniden BC245XLT
Press the Play button to make the indicator light for Roland ep-90/70
Commander / K867 / K775 / LN-7 Connection Diagram for Lincoln Electric 575
When Using the Camera for the First Time for Samsung EC-L730ZSDC/AS
Installation Avec Four Encastre for Wolf ICBWWD30
Illustrated Parts List for White Outdoor 83M
Available Dtcs code list for Icom IC-R20
TowerFeed Selftest Feature for HP TOWERFEED 8150
Is there a setup guide available for the NETGEAR FS605 v3?
View setup instructions
Top
Page
Image
Contents