American Power Conversion 208/220 installation manual Installation Space Requirements

Page 16

Site Preparation

Installation Space Requirements

Clearance for 20.59 in/523 mm Enclosures

(A)

(B)

UPS

 

 

 

 

Conduit Box

 

 

(F)

 

 

(C)

(D)

 

 

 

(G)

 

 

(E)

 

 

 

 

 

 

 

Space requirements

 

in

mm

 

 

 

 

Minimum clearance above Enclosure (A)

 

20.00

508

 

 

 

 

Enclosure depth (B)

 

32.99

838

 

 

 

 

Enclosure width (C)

 

20.59

523

 

 

 

Minimum rear service clearance* (compliant with NEC 110.26 for

36.00

914

North America) (D)

 

 

 

 

 

 

 

Minimum front clearance (E)

 

40.00

1,000

 

 

 

 

Conduit Box, depth (F)

 

3.46

88

 

 

 

No side clearance required (add width of Stabilizing Brackets for

0

0

floor anchoring if applicable)

 

 

 

 

 

 

 

Stabilizing Bracket width

 

3.34

85

 

 

 

Total installation depth, inclusive of Front Panel, Conduit Box and

112.45

2,840

minimum front and rear clearances (G)

 

 

 

 

 

 

 

*) Minimum free rear space for ventilation 4 in/100 mm.

10

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598B

Image 16
Contents Smart-UPSVT Page Smart-UPSVT 10-30 kVA 208/220 Page Contents Mechanical assembly Symbols used in this guide General Safety InstructionsEnvironmental symbols General safety Introduction 13.85 in/352 mm Enclosures UPS Family Range and Components20.59 in/523 mm Enclosures Serial number Type labelUser interface  Connection Interface rear  Upper Cover Plate rear  Upper part of Conduit BoxFoot print Humidity Sensor Installation Space Requirements Clearance for 20.59 in/523 mm EnclosuresClearance for stand-alone 13.85 in/352 mm Enclosures Operating Environment Operating conditionsHeat dissipation Audible noiseMinimum breaker settings for 10 kVA UPS Recommended current protectionMinimum breaker settings for 20 kVA UPS Minimum breaker settings for 15 kVA UPSMinimum setting of breakers for 30 kVA UPS EPO switch wiring DiameterBasic Wiring Overview EPOSite Preparation Checklist System components. Have youStabilizing Brackets  Setting the leveling feet Leveling FeetDrilling floor holes for floor anchoring Floor AnchoringHole positions for floor anchors stand-alone Enclosures Floor anchoring of stand-alone systems Electrical Installation System-Electrical InformationUPS ratings 220 Source connections Utility source Provided by others Utility source Wiring Input/Output Wiring Single Mains default Wiring procedure single mainsMains  input  Neutralcables   Output  cables Input/Output Wiring Dual Mains Wiring procedure dual mainsElectrical Installation Input/Output Wiring Dual Mains External Battery Wiring Wiring to battery bank or battery racks Bat+Communication Wiring to EPO and Optional Equipment Pin connections J106 XR Enclosure and J108 EPO Pin connections J106 UPS to J200 XR Enclosure optionJ106 Charging control switch Switch J200 XR Batteries Pin connections J108 for EPO wiring options +24V Normally ClosedConnection of APC Humidity Sensor Front panel removal  Electrical Installation Connection of APC Humidity Sensor Wiring Verification Procedure Installation Site Checklist 990-1598B