American Power Conversion 208/220 installation manual Recommended current protection

Page 19

Site Preparation – Operating Environment

Recommended current protection

AC output over-current protection and AC output disconnect must be provided by the customer.

Note

Dual/single

 

 

 

 

 

 

mains

Connection

10 kVA

15 kVA

20 kVA

30 kVA

Notes

configuration

 

 

 

 

 

 

 

Single

Mains/bypass

35 A

60 A

80 A breaker

125 A breaker

 

 

input

breaker (30

breaker (30

(30 kAIC)

(30 kAIC)

 

 

 

kAIC)

kAIC)

 

 

 

 

 

 

 

 

 

 

Dual

Mains input

35 A

60 A

80 A breaker

125 A breaker

1, 2

 

 

breaker

breaker

(30 kAIC)

(30 kAIC)

 

 

 

(30 kAIC)

(30 kAIC)

 

 

 

 

 

 

 

 

 

 

Dual

Bypass input

35 A

60 A

80 A breaker

125 A breaker

1, 2

 

 

breaker

breaker

(30 kAIC)

(30 kAIC)

 

 

 

(30 kAIC)

(30 kAIC)

 

 

 

 

 

 

 

 

 

 

Any

Output

35 A fast-

60 A fast-

80 A fast-

125 A fast-

3, 4

 

 

acting class

acting class

acting class

acting class

 

 

 

J fuse

J fuse

J fuse

J fuse

 

 

 

 

 

 

 

 

Note 1: If the available fault current of the installation is below 30 kA, a lower kAIC-rated breaker can be used.

Note 2: For breaker settings, refer to below table listing available overload currents.

Note 3: If the available fault current of the installation is less than 1200 A for the 10 kVA and 15 kVA UPS sizes, and below 2300 A for the 20 kVA and 30 kVA UPS sizes, a breaker (of the same value as for the bypass input) can be used.

Note 4: Recommended maximum rating of a single-fuse configuration if the internal bypass is to be protected during a load short-circuit.

Minimum breaker settings for 10 kVA UPS

Overload Event

Mains input

Bypass input

Output

Duration

Notes

 

 

 

 

 

 

Internal fault

2 kA

1.7 kA

14 kA

<10 ms

1

 

 

 

 

 

 

800% overload bypass

223 A

223 A

500 ms

 

operation

 

 

 

 

 

 

 

 

 

 

 

150% overload normal/

42 A

30 s

 

battery operation

 

 

 

 

 

 

 

 

 

 

 

125% overload normal/

35 A

60 s

 

battery operation

 

 

 

 

 

 

 

 

 

 

 

Continuously

34 A

31 A

31 A

 

 

 

 

 

 

 

Note 1: For the output value, the short-circuit-level is indicated.

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

13

Image 19
Contents Smart-UPSVT Page Smart-UPSVT 10-30 kVA 208/220 Page Contents Mechanical assembly Symbols used in this guide General Safety InstructionsEnvironmental symbols General safety Introduction 13.85 in/352 mm Enclosures UPS Family Range and Components20.59 in/523 mm Enclosures Type label Serial number  User interface Upper Cover Plate rear  Upper part of Conduit Box Connection Interface rearFoot print Humidity Sensor Clearance for 20.59 in/523 mm Enclosures Installation Space RequirementsClearance for stand-alone 13.85 in/352 mm Enclosures Audible noise Operating EnvironmentOperating conditions Heat dissipationRecommended current protection Minimum breaker settings for 10 kVA UPSMinimum breaker settings for 20 kVA UPS Minimum breaker settings for 15 kVA UPSMinimum setting of breakers for 30 kVA UPS Diameter EPO switch wiringEPO Basic Wiring OverviewSystem components. Have you Site Preparation Checklist  Stabilizing BracketsLeveling Feet Setting the leveling feetDrilling floor holes for floor anchoring Floor AnchoringHole positions for floor anchors stand-alone Enclosures Floor anchoring of stand-alone systems System-Electrical Information Electrical InstallationUPS ratings 220 Source connections Utility source Provided by others Utility source Wiring Wiring procedure single mains Input/Output Wiring Single Mains defaultMains  input  Neutralcables   Output  cables Wiring procedure dual mains Input/Output Wiring Dual MainsElectrical Installation Input/Output Wiring Dual Mains Wiring to battery bank or battery racks Bat+ External Battery WiringCommunication Wiring to EPO and Optional Equipment Pin connections J106 UPS to J200 XR Enclosure option Pin connections J106 XR Enclosure and J108 EPOJ106 Charging control switch Switch J200 XR Batteries +24V Normally Closed Pin connections J108 for EPO wiring optionsFront panel removal Connection of APC Humidity Sensor  Electrical Installation Connection of APC Humidity Sensor Wiring Verification Procedure Installation Site Checklist 990-1598B