American Power Conversion 208/220 Mains  input  Neutralcables   Output  cables

Page 35

Loosen the (4) M4 screws (2 each side) from the bottom part of the Conduit Box and remove.

Punch 2 holes in the marked areas of the Conduit Box bottom to fit the size of the conduit pipes, and reattach the Conduit Box bottom to the Enclosure, re-using the (4) M4 screws.

Install conduit pipes in the Conduit Box.

Run cables through the conduit pipes and the bottom of the Conduit Box, pull behind the bar and up into the input/output area.

Reinstall the top part of the Conduit Box to the Enclosure, following reverse installation procedures.

Mains input Neutralcables

 

 

L1

 

 

L2

L3

 

 

N

Neutral

 

 

N

 

L1

Output

 

 

 

L2

cables

 

 

 

L3

 

 

 

cablesGround

Attach input cable lugs to L1, L2 and L3 input busbars (left side in the UPS – on the front of the busbar), using the provided M6 torx screws. Attach output cable lugs to L1, L2 and L3 output busbars, using the provided M6 torx screws. Attach N x 2 where shown, using the provided torx screws.

Attach Ground x 2 where shown, using the provided torx screws.

Fasten cables with cable ties.

Reinstall rear cover.

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

29

Image 35
Contents Smart-UPSVT Page Smart-UPSVT 10-30 kVA 208/220 Page Contents Mechanical assembly Environmental symbols General Safety InstructionsSymbols used in this guide General safety Introduction 20.59 in/523 mm Enclosures UPS Family Range and Components13.85 in/352 mm Enclosures Type label Serial number  User interface Upper Cover Plate rear  Upper part of Conduit Box Connection Interface rearFoot print Humidity Sensor Clearance for 20.59 in/523 mm Enclosures Installation Space RequirementsClearance for stand-alone 13.85 in/352 mm Enclosures Audible noise Operating EnvironmentOperating conditions Heat dissipationRecommended current protection Minimum breaker settings for 10 kVA UPSMinimum setting of breakers for 30 kVA UPS Minimum breaker settings for 15 kVA UPSMinimum breaker settings for 20 kVA UPS Diameter EPO switch wiringEPO Basic Wiring OverviewSystem components. Have you Site Preparation Checklist  Stabilizing BracketsLeveling Feet Setting the leveling feetHole positions for floor anchors stand-alone Enclosures Floor AnchoringDrilling floor holes for floor anchoring Floor anchoring of stand-alone systems System-Electrical Information Electrical InstallationUPS ratings 220 Source connections Utility source Provided by others Utility source Wiring Wiring procedure single mains Input/Output Wiring Single Mains defaultMains  input  Neutralcables   Output  cables Wiring procedure dual mains Input/Output Wiring Dual MainsElectrical Installation Input/Output Wiring Dual Mains Wiring to battery bank or battery racks Bat+ External Battery WiringCommunication Wiring to EPO and Optional Equipment Pin connections J106 UPS to J200 XR Enclosure option Pin connections J106 XR Enclosure and J108 EPOJ106 Charging control switch Switch J200 XR Batteries +24V Normally Closed Pin connections J108 for EPO wiring optionsFront panel removal Connection of APC Humidity Sensor  Electrical Installation Connection of APC Humidity Sensor Wiring Verification Procedure Installation Site Checklist 990-1598B