American Power Conversion 208/220 Electrical Installation Input/Output Wiring Dual Mains

Page 37

Electrical Installation – Input/Output Wiring – Dual Mains

Punch 3 holes in the Conduit Box bottom to fit the size of the conduit pipes, and reattach the Conduit Box bottom to the Enclosure, re-using the (4) M4 screws.

Install conduit pipes in the Conduit Box bottom.

Run cables through the conduit pipes and the bottom of the Conduit Box. Guide the cables behind the bar and up into the input/output area.

Reinstall the top part of the Conduit Box to the Enclosure, following reverse deinstallation procedures (described in a previous step).

Remove the (2) M6 screws from Brackets A, B, and C and remove all 3 brackets.

Utility input cables Neutral

 

 

 

L1

 

 

 

L2

L3

 

Neutral

 

 

 

N

N

Bypass

 

L1

 

 

 

L2

L3

input

 

 

L1

cables

 

 

Output

 

 

L2

 

 

 

 

L3

cables

 

 

N

Neutral

Groundcables

Attach input cable lugs to L1, L2 and L3 input busbars (left side in the UPS – on the front of the busbar), using the provided M6 torx screws. Attach bypass cable lugs to L1, L2, L3 bypass busbars, using the provided torx screws. Attach output cable lugs to L1, L2, L3 output busbars, using the provided torx screws.

Attach N x 3 where shown., using the provided torx screws.

Attach Ground x 3 where shown.

Fasten all cables with cable ties.

Reinstall rear cover.

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

31

Image 37
Contents Smart-UPSVT Page Smart-UPSVT 10-30 kVA 208/220 Page Contents Mechanical assembly Symbols used in this guide General Safety InstructionsEnvironmental symbols General safety Introduction 13.85 in/352 mm Enclosures UPS Family Range and Components20.59 in/523 mm Enclosures Type label Serial number  User interface Upper Cover Plate rear  Upper part of Conduit Box Connection Interface rearFoot print Humidity Sensor Clearance for 20.59 in/523 mm Enclosures Installation Space RequirementsClearance for stand-alone 13.85 in/352 mm Enclosures Operating conditions Operating EnvironmentHeat dissipation Audible noiseRecommended current protection Minimum breaker settings for 10 kVA UPSMinimum breaker settings for 20 kVA UPS Minimum breaker settings for 15 kVA UPSMinimum setting of breakers for 30 kVA UPS Diameter EPO switch wiringEPO Basic Wiring OverviewSystem components. Have you Site Preparation Checklist  Stabilizing BracketsLeveling Feet Setting the leveling feetDrilling floor holes for floor anchoring Floor AnchoringHole positions for floor anchors stand-alone Enclosures Floor anchoring of stand-alone systems System-Electrical Information Electrical InstallationUPS ratings 220 Source connections Utility source Provided by others Utility source Wiring Wiring procedure single mains Input/Output Wiring Single Mains defaultMains  input  Neutralcables   Output  cables Wiring procedure dual mains Input/Output Wiring Dual MainsElectrical Installation Input/Output Wiring Dual Mains Wiring to battery bank or battery racks Bat+ External Battery WiringCommunication Wiring to EPO and Optional Equipment Pin connections J106 UPS to J200 XR Enclosure option Pin connections J106 XR Enclosure and J108 EPOJ106 Charging control switch Switch J200 XR Batteries +24V Normally Closed Pin connections J108 for EPO wiring optionsFront panel removal Connection of APC Humidity Sensor  Electrical Installation Connection of APC Humidity Sensor Wiring Verification Procedure Installation Site Checklist 990-1598B