American Power Conversion 208/220 installation manual Utility source Provided by others

Page 31

Electrical Installation – System-Electrical Information

One-line diagram for Smart-UPS VT 10, 15, 20, 30kVA, 208V, 3 phase, single mains

Utility source

 

(provided by others)

MIB

1

 

10kVA, 35A.T.

 

 

3PH 208Y/120V

 

 

15kVA, 60A.T.

 

 

4 wire + ground

 

 

20kVA, 80A.T.

 

 

 

 

 

 

 

 

 

 

30kVA, 125A.T.

 

 

 

 

 

 

 

 

 

 

10kVA, 27.8A

 

 

 

 

 

15kVA, 41.7A

2

 

 

 

 

20kVA, 55.6A

 

 

 

 

 

 

 

 

 

30kVA, 83.3A

 

 

 

Maintenance

 

 

 

Bypass

 

 

 

 

 

Panel

 

 

10kVA, 27.8A

 

 

Q1(UIS)

15kVA, 41.7A

 

 

 

3P

 

 

 

20kVA, 55.6A

 

 

 

 

 

30kVA, 83.3A

 

10kVA, 27.8A

 

 

 

 

15kVA, 41.7A

 

 

 

 

20kVA, 55.6A

2

 

 

 

30kVA, 83.3A

 

 

 

 

XR Battery Cabinet 8

 

UPS

 

10kVA, 22.2A

DC Input

15kVA, 33.3A

20kVA, 44.4A

Breaker

30kVA, 66.6A

 

2

5

10kVA, 27.8A 15kVA, 41.7A 20kVA, 55.6A 30kVA, 83.3A

MBS

3P

Notes:

1. Must be 4 wire + ground WYE source provided by others.

2. Dashed lines between units (- - -) represent AC/DC cabling provided by others.

3.Input overcurrent protection is based on 80% rating – any deviation please contact APC.

4.AC Power cabling is 4 wire + ground at 208VAC 3-phase. 5. Separate conduits, 2 wire + ground

6.UPS input and output cables must be in separate conduits.

7.Power wiring and control wiring must be in separate conduits

8. XR Battery Enclosure can be bayed to UPS. Baying kit has to be purchased as an option.

XR Battery Enclosure is available without breaker with DC fuses only. Up to 4 XR Battery Enclosures can be connected to UPS to extend backup time.

9.Single mains installation is a default.

Dual Mains option requires custom entineering. Please refer to APC Custom Engineering group and drawing# CEG- SUVT10kF-SD for details.

10.Installation must comply with all applicable national and local codes.

10kVA, 27.8A 15kVA, 41.7A 20kVA, 55.6A 2 30kVA, 83.3A

Q2/UOS)

Q3(BPS)

4P

4P

 

 

F1, 3P

2

UPS System Output 10kVA, 15lVA,

20kVA and 30kVA

208V 3ph – 4 wire + ground or

120V 1ph – 2 wire + ground

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

25

Image 31
Contents Smart-UPSVT Page Smart-UPSVT 10-30 kVA 208/220 Page Contents Mechanical assembly Symbols used in this guide General Safety InstructionsEnvironmental symbols General safety Introduction 13.85 in/352 mm Enclosures UPS Family Range and Components20.59 in/523 mm Enclosures Type label Serial number  User interface Upper Cover Plate rear  Upper part of Conduit Box Connection Interface rearFoot print Humidity Sensor Clearance for 20.59 in/523 mm Enclosures Installation Space RequirementsClearance for stand-alone 13.85 in/352 mm Enclosures Audible noise Operating EnvironmentOperating conditions Heat dissipationRecommended current protection Minimum breaker settings for 10 kVA UPSMinimum breaker settings for 20 kVA UPS Minimum breaker settings for 15 kVA UPSMinimum setting of breakers for 30 kVA UPS Diameter EPO switch wiringEPO Basic Wiring OverviewSystem components. Have you Site Preparation Checklist  Stabilizing BracketsLeveling Feet Setting the leveling feetDrilling floor holes for floor anchoring Floor AnchoringHole positions for floor anchors stand-alone Enclosures Floor anchoring of stand-alone systems System-Electrical Information Electrical InstallationUPS ratings 220 Source connections Utility source Provided by others Utility source Wiring Wiring procedure single mains Input/Output Wiring Single Mains defaultMains  input  Neutralcables   Output  cables Wiring procedure dual mains Input/Output Wiring Dual MainsElectrical Installation Input/Output Wiring Dual Mains Wiring to battery bank or battery racks Bat+ External Battery WiringCommunication Wiring to EPO and Optional Equipment Pin connections J106 UPS to J200 XR Enclosure option Pin connections J106 XR Enclosure and J108 EPOJ106 Charging control switch Switch J200 XR Batteries +24V Normally Closed Pin connections J108 for EPO wiring optionsFront panel removal Connection of APC Humidity Sensor  Electrical Installation Connection of APC Humidity Sensor Wiring Verification Procedure Installation Site Checklist 990-1598B