American Power Conversion 208/220 Clearance for stand-alone 13.85 in/352 mm Enclosures

Page 17

Site Preparation – Installation Space Requirements

Clearance for stand-alone 13.85 in/352 mm Enclosures

(B)

UPS

(C)

(E)

(A)

Conduit Box (F)

(D)

Stabilizing Bracket, left and right

(G)

Space requirements

in

mm

 

 

 

Minimum clearance above UPS (A)

20.00

508

 

 

 

UPS depth (B)

32.99

854

 

 

 

UPS width

13.85

352

 

 

 

Minimum rear service clearance* (compliant with NEC 110.26

36.00

914

for North America) (D)

 

 

 

 

 

Minimum front clearance (E)

40.00

1,000

 

 

 

Conduit Box, depth (F)

3.46

88

 

 

 

No side clearance required (add width of Stabilizing Bracket for

0

0

floor anchoring if applicable)

 

 

 

 

 

Stabilizing Bracket width

3.34

85

 

 

 

Total installation depth, inclusive of Front Panel, Conduit Box

112.45

2.840

and minimum front and rear clearances (G)

 

 

 

 

 

*) Minimum free rear space for ventilation 4 in/100 mm.

For the stability of 13.85 in/352 mm stand-alone Enclosures, the Stabilizing Brackets must always be mounted on both sides of the UPS. See Stabilizing Brackets.

990-1598B Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual

11

Image 17
Contents Smart-UPSVT Page Smart-UPSVT 10-30 kVA 208/220 Page Contents Mechanical assembly Environmental symbols General Safety InstructionsSymbols used in this guide General safety Introduction 20.59 in/523 mm Enclosures UPS Family Range and Components13.85 in/352 mm Enclosures Type label Serial number  User interface Upper Cover Plate rear  Upper part of Conduit Box Connection Interface rearFoot print Humidity Sensor Clearance for 20.59 in/523 mm Enclosures Installation Space RequirementsClearance for stand-alone 13.85 in/352 mm Enclosures Operating conditions Operating EnvironmentHeat dissipation Audible noiseRecommended current protection Minimum breaker settings for 10 kVA UPSMinimum setting of breakers for 30 kVA UPS Minimum breaker settings for 15 kVA UPSMinimum breaker settings for 20 kVA UPS Diameter EPO switch wiringEPO Basic Wiring OverviewSystem components. Have you Site Preparation Checklist  Stabilizing BracketsLeveling Feet Setting the leveling feetHole positions for floor anchors stand-alone Enclosures Floor AnchoringDrilling floor holes for floor anchoring Floor anchoring of stand-alone systems System-Electrical Information Electrical InstallationUPS ratings 220 Source connections Utility source Provided by others Utility source Wiring Wiring procedure single mains Input/Output Wiring Single Mains defaultMains  input  Neutralcables   Output  cables Wiring procedure dual mains Input/Output Wiring Dual MainsElectrical Installation Input/Output Wiring Dual Mains Wiring to battery bank or battery racks Bat+ External Battery WiringCommunication Wiring to EPO and Optional Equipment Pin connections J106 UPS to J200 XR Enclosure option Pin connections J106 XR Enclosure and J108 EPOJ106 Charging control switch Switch J200 XR Batteries +24V Normally Closed Pin connections J108 for EPO wiring optionsFront panel removal Connection of APC Humidity Sensor  Electrical Installation Connection of APC Humidity Sensor Wiring Verification Procedure Installation Site Checklist 990-1598B