American Power Conversion 208/220 Pin connections J106 XR Enclosure and J108 EPO

Page 40

Electrical Installation – Communication Wiring to EPO and Optional Equipment

Pin connections J106 (XR Enclosure) and J108 (EPO)

L1

L2

L3

N

N

L1

L2

L3

J106 Pin Connections:

8Ext. charging control return

7External control of charging

6Q3 active return

5Q3 active

4Battery measurement supply*

3Battery unit quantity*

2Max. battery temperature*

1Battery measurement return*

*Should be used with APC XR Enclosures only

J108 Pin Connections:

1 Normally open EPO

2Normally open EPO return

3Normally closed EPO

4Normally closed EPO return

5+24V SELV supply

6SELV ground

Pin connections J106 (UPS) to J200 (XR Enclosure - option)

Pins 1 through 4 are for battery measurement (only applicable to APC XR Enclosures).

Pins 5 & 6 are for external maintenance bypass Q3. When Q3 is closed, signals are fed back to the UPS controller.

Pins 7 & 8 are for external charge control. When 7 & 8 are closed, the UPS charges batteries with a pre-defined percentage (0-100%) of the maximum charging power. To be used in generator applications, or if special codes requires control of charging.

34

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598B

Image 40
Contents Smart-UPSVT Page Smart-UPSVT 10-30 kVA 208/220 Page Contents Mechanical assembly Symbols used in this guide General Safety InstructionsEnvironmental symbols General safety Introduction 13.85 in/352 mm Enclosures UPS Family Range and Components20.59 in/523 mm Enclosures Serial number Type labelUser interface  Connection Interface rear  Upper Cover Plate rear  Upper part of Conduit BoxFoot print Humidity Sensor Installation Space Requirements Clearance for 20.59 in/523 mm EnclosuresClearance for stand-alone 13.85 in/352 mm Enclosures Operating Environment Operating conditionsHeat dissipation Audible noiseMinimum breaker settings for 10 kVA UPS Recommended current protectionMinimum breaker settings for 20 kVA UPS Minimum breaker settings for 15 kVA UPSMinimum setting of breakers for 30 kVA UPS EPO switch wiring DiameterBasic Wiring Overview EPOSite Preparation Checklist System components. Have youStabilizing Brackets  Setting the leveling feet Leveling FeetDrilling floor holes for floor anchoring Floor AnchoringHole positions for floor anchors stand-alone Enclosures Floor anchoring of stand-alone systems Electrical Installation System-Electrical InformationUPS ratings 220 Source connections Utility source Provided by others Utility source Wiring Input/Output Wiring Single Mains default Wiring procedure single mainsMains  input  Neutralcables   Output  cables Input/Output Wiring Dual Mains Wiring procedure dual mainsElectrical Installation Input/Output Wiring Dual Mains External Battery Wiring Wiring to battery bank or battery racks Bat+Communication Wiring to EPO and Optional Equipment Pin connections J106 XR Enclosure and J108 EPO Pin connections J106 UPS to J200 XR Enclosure optionJ106 Charging control switch Switch J200 XR Batteries Pin connections J108 for EPO wiring options +24V Normally ClosedConnection of APC Humidity Sensor Front panel removal  Electrical Installation Connection of APC Humidity Sensor Wiring Verification Procedure Installation Site Checklist 990-1598B