American Power Conversion 208/220 Electrical Installation, System-Electrical Information

Page 28

Electrical Installation

System-Electrical Information

WARNING!

All electrical power and power control wiring must be installed by a qualified electrician, and must comply with local and national regulations for maximum power rating.

UPS ratings 208 V

10 kVA

15 kVA

20kVA

30 kVA

8 kW

12 kW

16 kW

24 kW

 

 

 

 

 

 

Input voltage / Bypass voltage (V)

3-phase

3-phase

3phase

3-phase

 

208Y/

208Y/

208Y/

208Y/

 

120 V

120 V

120 V

120 V

 

 

 

 

 

Input current (nominal, per phase) (A)

24.3

36.5

48.2

72.9

 

 

 

 

 

Maximum input current per phase (continuous, at

26.7

40.2

53.0

80.1

minimum mains voltage)

 

 

 

 

 

 

 

 

 

Input current protection for mains source or single

3x35

3x60

3x80

3x125

mains supply (external to UPS, not supplied) (A)

 

 

 

 

 

 

 

 

 

Input current protection for bypass source in dual mains

35

60

80

125

configuration (external to UPS, not supplied) (A)

 

 

 

 

 

 

 

 

 

Input frequency (Hz) range

40-70

40-70

40-70

40-70

 

 

 

 

 

Output voltage (on line). (V)

120/208

120/208

120/208

120/208

Minimum and maximum values (+/- 1%)

 

 

 

 

 

 

 

 

 

Output current (nominal, per phase) (A)

27.8

41.6

55.5

83.3

 

 

 

 

 

Maximum output current

30.5

45.8

61.1

91.6

(in bypass only at 110% overload per phase)

 

 

 

 

 

 

 

 

 

Neutral output current (with 100% switch mode load)

48.1

72.1

96.2

144.2

(A)

 

 

 

 

 

 

 

 

 

Output current protection (external to UPS, not

40

60

80

120

supplied) (A)

 

 

 

 

 

 

 

 

 

Output frequency range (Hz)

50/60

50/60

50/60

50/60

 

 

 

 

 

DC overcurrent protection and disconnect switch for

27.8

41.8

55.7

83.5

external safety:

 

 

 

 

DC voltage rating of the battery supply

+/- 192

+/- 192

+/- 192

+/- 192

Maximum available short-circuit current

10 kA

10 kA

10 kA

10 kA

 

 

 

 

 

22

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598B

Image 28
Contents Smart-UPSVT Page Smart-UPSVT 10-30 kVA 208/220 Page Contents Mechanical assembly Symbols used in this guide General Safety InstructionsEnvironmental symbols General safety Introduction 13.85 in/352 mm Enclosures UPS Family Range and Components20.59 in/523 mm Enclosures Serial number Type labelUser interface  Connection Interface rear  Upper Cover Plate rear  Upper part of Conduit BoxFoot print Humidity Sensor Installation Space Requirements Clearance for 20.59 in/523 mm EnclosuresClearance for stand-alone 13.85 in/352 mm Enclosures Operating Environment Operating conditionsHeat dissipation Audible noiseMinimum breaker settings for 10 kVA UPS Recommended current protectionMinimum breaker settings for 20 kVA UPS Minimum breaker settings for 15 kVA UPSMinimum setting of breakers for 30 kVA UPS EPO switch wiring DiameterBasic Wiring Overview EPOSite Preparation Checklist System components. Have youStabilizing Brackets  Setting the leveling feet Leveling FeetDrilling floor holes for floor anchoring Floor AnchoringHole positions for floor anchors stand-alone Enclosures Floor anchoring of stand-alone systems Electrical Installation System-Electrical InformationUPS ratings 220 Source connections Utility source Provided by others Utility source Wiring Input/Output Wiring Single Mains default Wiring procedure single mainsMains  input  Neutralcables   Output  cables Input/Output Wiring Dual Mains Wiring procedure dual mainsElectrical Installation Input/Output Wiring Dual Mains External Battery Wiring Wiring to battery bank or battery racks Bat+Communication Wiring to EPO and Optional Equipment Pin connections J106 XR Enclosure and J108 EPO Pin connections J106 UPS to J200 XR Enclosure optionJ106 Charging control switch Switch J200 XR Batteries Pin connections J108 for EPO wiring options +24V Normally ClosedConnection of APC Humidity Sensor Front panel removal  Electrical Installation Connection of APC Humidity Sensor Wiring Verification Procedure Installation Site Checklist 990-1598B