American Power Conversion 208/220 Floor Anchoring, Drilling floor holes for floor anchoring

Page 26

Floor Anchoring

Note

If floor anchoring is required in your area, read this section. If not, proceed to Operating Environment. However, if you install a 13.85 in/352 mm Enclosure, it must always be equipped with the Stabilizing Bracket for enhanced stability (not necessary to bolt the Stabilizing Bracket to the floor in non-seismic areas).

Drilling floor holes for floor anchoring

Note

If the UPS installation requires floor anchoring, the UPS installation must be anchored to the floor, re-using the brackets that also secured the UPS to the pallets when shipped. For easy determination of where to drill the holes, refer to the applicable drawings below indicating hole positions and size.

Hole positions for floor anchors (stand-alone Enclosures)

Rear

Rear

5.78in/

147mm

5.11in/

130mm

5.11in/

130mm

5.11in/

130mm

5.11in/

130mm

5.11in/

130mm

0.92in/

23.5mm

Floor anchor holes:

Floor anchor holes:

Ø 10 mm

Ø 10 mm

 

 

20.59 in/523 mm Enclosure

25in/650mm

13.85 in/352 mm

 

 

Enclosure

26.3in/575mm

 

 

 

15.9in/404mm

 

 

Refer to this drawing for floor anchor positions for 20.59 in/523 mm.

Refer to this drawing for 13.85 in/352 mm.

20

Smart-UPS® VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598B

Image 26
Contents Smart-UPSVT Page Smart-UPSVT 10-30 kVA 208/220 Page Contents Mechanical assembly Environmental symbols General Safety InstructionsSymbols used in this guide General safety Introduction 20.59 in/523 mm Enclosures UPS Family Range and Components13.85 in/352 mm Enclosures Serial number Type labelUser interface  Connection Interface rear  Upper Cover Plate rear  Upper part of Conduit BoxFoot print Humidity Sensor Installation Space Requirements Clearance for 20.59 in/523 mm EnclosuresClearance for stand-alone 13.85 in/352 mm Enclosures Heat dissipation Operating EnvironmentOperating conditions Audible noiseMinimum breaker settings for 10 kVA UPS Recommended current protectionMinimum setting of breakers for 30 kVA UPS Minimum breaker settings for 15 kVA UPSMinimum breaker settings for 20 kVA UPS EPO switch wiring DiameterBasic Wiring Overview EPOSite Preparation Checklist System components. Have youStabilizing Brackets  Setting the leveling feet Leveling FeetHole positions for floor anchors stand-alone Enclosures Floor AnchoringDrilling floor holes for floor anchoring Floor anchoring of stand-alone systems Electrical Installation System-Electrical InformationUPS ratings 220 Source connections Utility source Provided by others Utility source Wiring Input/Output Wiring Single Mains default Wiring procedure single mainsMains  input  Neutralcables   Output  cables Input/Output Wiring Dual Mains Wiring procedure dual mainsElectrical Installation Input/Output Wiring Dual Mains External Battery Wiring Wiring to battery bank or battery racks Bat+Communication Wiring to EPO and Optional Equipment Pin connections J106 XR Enclosure and J108 EPO Pin connections J106 UPS to J200 XR Enclosure optionJ106 Charging control switch Switch J200 XR Batteries Pin connections J108 for EPO wiring options +24V Normally ClosedConnection of APC Humidity Sensor Front panel removal  Electrical Installation Connection of APC Humidity Sensor Wiring Verification Procedure Installation Site Checklist 990-1598B