American Power Conversion
208/220
installation manual
Install
Symbols used in this guide
EPO switch wiring
Mechanical assembly
Setting the leveling feet
Checklist
Safety
Page 4
Page 3
Page 5
Image 4
Page 3
Page 5
Contents
Smart-UPSVT
Page
Smart-UPSVT 10-30 kVA 208/220
Page
Contents
Mechanical assembly
Symbols used in this guide
General Safety Instructions
Environmental symbols
General safety
Introduction
13.85 in/352 mm Enclosures
UPS Family Range and Components
20.59 in/523 mm Enclosures
Serial number
Type label
User interface
Connection Interface rear
Upper Cover Plate rear Upper part of Conduit Box
Foot print
Humidity Sensor
Installation Space Requirements
Clearance for 20.59 in/523 mm Enclosures
Clearance for stand-alone 13.85 in/352 mm Enclosures
Operating Environment
Operating conditions
Heat dissipation
Audible noise
Minimum breaker settings for 10 kVA UPS
Recommended current protection
Minimum breaker settings for 20 kVA UPS
Minimum breaker settings for 15 kVA UPS
Minimum setting of breakers for 30 kVA UPS
EPO switch wiring
Diameter
Basic Wiring Overview
EPO
Site Preparation Checklist
System components. Have you
Stabilizing Brackets
Setting the leveling feet
Leveling Feet
Drilling floor holes for floor anchoring
Floor Anchoring
Hole positions for floor anchors stand-alone Enclosures
Floor anchoring of stand-alone systems
Electrical Installation
System-Electrical Information
UPS ratings 220
Source connections
Utility source Provided by others
Utility source
Wiring
Input/Output Wiring Single Mains default
Wiring procedure single mains
Mains input Neutralcables Output cables
Input/Output Wiring Dual Mains
Wiring procedure dual mains
Electrical Installation Input/Output Wiring Dual Mains
External Battery Wiring
Wiring to battery bank or battery racks Bat+
Communication Wiring to EPO and Optional Equipment
Pin connections J106 XR Enclosure and J108 EPO
Pin connections J106 UPS to J200 XR Enclosure option
J106 Charging control switch Switch J200 XR Batteries
Pin connections J108 for EPO wiring options
+24V Normally Closed
Connection of APC Humidity Sensor
Front panel removal
Electrical Installation Connection of APC Humidity Sensor
Wiring Verification Procedure
Installation Site Checklist
990-1598B
Related pages
Troubleshooting Guide for BRK electronic GCO1B
Specifications for Lumex Syatems RJ4300G
Error Code and Error Status Names for Toshiba A10
Connection Diagram for VocoPro CDG X-3 Mark II
HOW to USE Programs Directly from OUR WEB Site for NordicTrack NTTL15510
Reinstalling Windows for Dell 2200
Parts List for Desa SVYD18N
Language Code List for Onkyo HTP-V10X
What is it? for Philips 190S1
safety Information for Samsung RS261MDPN
How do I set up the
Cateye CC-HB100
for optimal use?
Top
Page
Image
Contents