How Long will the Data Migration Take?
The data migration process includes planning, ordering, shipping, installing and testing the system. The following table shows approximately how long a data migration might take.
Note: You should plan at least one additional hour of down time to upgrade the operating system for source systems not at the new server release level.
Order Planning - 5 to 15 Days | Installation Planning and | Phase II Installation - Weekend (1 to 3 |
| Preparation - 10 to 30 days | days) |
|
|
|
See “Prerequisite and related | See “Prerequisite and related | Migrate Data |
information” on page vii for | information” on page vii for |
|
required publications. | required publications. |
|
|
|
|
System Requirements | Solution Assurance | Verify System |
|
|
|
Performance | Physical Planning (Site | Check History and Clean Up Messages |
| Preparation) |
|
|
|
|
Determine Services Needed | Software Preparation (Upgrade | Save System |
| Source System Software) |
|
|
|
|
Place Order | Save System |
|
|
|
|