IBM SA41-5155-05 manual V4R4M0

Page 8

vThe term 8xx includes Model 820, 830, or 840.

vThe term iSeries or iSeries 400 as used in this document refers to the new generation of (previously AS/400) systems and servers positioned for e-business: e-systems and e-servers, for example Model 170.

vThe term iSeries server as used in this document refers to:

iSeries system- Models 40x, 5x0, 150 and 6x0.

iSeries server- Models 40S, 5xS, Sxx, 170, 2xx, 7xx and 8xx.

vThe term System Products Division (SPD) book-typeadapter cards includes all adapter cards that are not Peripheral Component Interconnect (PCI) adapter cards.

In this publication, the version, release, and modification levels are shown in a shortened form:

V4R4M0

Version 4 Release 4

Modification 0

V4R5M0

Version 4 Release 5

Modification 0

V5R1M0

Version 5

Release 1

Modification 0

V4R4

Version 4

Release 4

Modification (any)

V4R5

Version 4

Release 5

Modification (any)

V5R1

Version 5

Release 1

Modification (any)

Version 5

Any version 5 release, such as, V5R1M0.

Version 4

Any version 4 release, such as, V4R1M0, V4R2M0 or V4R3M0.

Attention:

 

 

 

Is used in this book to indicate that a step, or process may cause loss of data.

Namely: Installing incorrect versions of the operating system.

CAUTION:

Is used in this book to indicate possible damage to the system. Namely: Static damage to component.

DANGER

Is used in this book to indicate possible damage to the users and equipment. Namely: Electrical shock.

In any position that contains numerals, an x = any supported value, for example SFxxxxx, or VxRxMx.

Examples of displays might contain only pertinent information to a topic. So, some display examples do not show all text and lines, especially blank lines.

viiSeries 940x RISC-to-RISC Road Map V5R1

Image 8
Contents ISeries 940x RISC-to-RISC Road Map Page ISeries 940x RISC-to-RISC Road Map Sixth Edition May Contents Iv iSeries 940x RISC-to-RISC Road Map V5R1 Conventions and Terminology Used in This Book ISeries 940x RISC-to-RISC Road Map, SA41-5155-05Who Should Read This Book V4R4M0 Under the System Planning and Installation topic Prerequisite and related informationHow to send your comments Operations NavigatorISeries 940x RISC-to-RISC Road Map, SA41-5155-05 ISeries 940x RISC-to-RISC Road Map V5R1 Overview of RISC-to-RISC Upgrades and Data Migrations What is in this Road Map?What is an Upgrade? Upgrade process flowHardware Investment for Upgrading How Long will the Upgrade Take?What is a Data Migration? Data migration process flow Books to Use for Software Release Upgrades How Long will the Data Migration Take?ISeries 940x RISC-to-RISC Road Map V5R1 Determining Your Upgrade Needs Planning Your Order for Upgrading or Data MigrationHow to Gather Configuration Information How to Gather Performance InformationPrerequisites Before Placing an Order Version 4 Software ItemsOther Software Related Items Hardware ConsiderationsSystem Configuration Considerations Services and Other AssistanceModel-specific Considerations for Placing an Order Upgrading from a 4xx, 5xx, Sxx, or 6xx to a Migrating from a 5xx to an Upgrading from a 6xx or 7xx to an Placing the Upgrade OrderWho is Responsible for Ordering the Upgrade? Sending the Order to IBM How to Get Help with the OrderSending the Order to a Software Service Provider Other Than ISeries 940x RISC-to-RISC Road Map V5R1 Procedure for an Upgrade RISC-to-RISC Who is Responsible for Upgrading the SystemWhat to Do When the Hardware Arrives Preparing the Current SystemThis is where you load the new operating system Preparing for System Assurance prior to hardware upgrade Print Disk Configuration Status of the installed system ISeries 940x RISC-to-RISC Road Map V5R1 System Assurance Checkpoint Installing the Hardware for the RISC-to-RISC Upgrade Managing your new system I/O resourcesInformation Center under System planning and installation ISeries 940x RISC-to-RISC Road Map V5R1 Change Description Label display appears Performing a new system backup Perform a normal IPLProcedure for an Upgrade RISC-to-RISC Systems Management Work management- Work Management Manuals Preparing the source system for the migration Procedure for a Data Migration RISC-to-RISCPrerequisites for data migration Risc to Risc Data migration RISC-to-RISC Procedure for a Data Migration RISC-to-RISC ISeries 940x RISC-to-RISC Road Map V5R1 Appendix A. AS/400 Global Services ISeries and AS/400 Data Migration ServicesLpar Planning and Implementation Services ISeries Planning and Migration ServicesRelated Support Services AS/400 Solution Services Installation ServicesConsulting Services Performance ExaminationsMidrange Enhanced Software Service Mress ISeries 940x RISC-to-RISC Road Map V5R1 Appendix B. Considerations and Solutions IBM Http Server for AS/400SRC A900 2000 Recovery Operations Console OptiConnectIntegrated Netfinity Server Clustering and Logical PartitionsHow to Move Freed Database Files without New Members Command to restore the file. For a logical file, use PTF ISeries 940x RISC-to-RISC Road Map V5R1 Appendix D. Notices Trademarks IBMAppendix D. Notices ISeries 940x RISC-to-RISC Road Map V5R1 Index RtvcfgsrcISeries 940x RISC-to-RISC Road Map V5R1 Readers’ Comments We’d Like to Hear from You How satisfied are you that the information in this book isBusiness Reply Mail Page SA41-5155-05