IBM SA41-5155-05 manual Index, Rtvcfgsrc

Page 61

Index

A

A900 2000 SRC

 

recovery

25

 

A900 2000 system reference code

 

(SRC) 25

 

 

alternate installation device

 

installing from

 

considerations for placing an

 

order

11

 

verify availability of hardware

23

AS/400 Data Migration Services 35

AS/400 Solution Services 36

 

AS/400 System Migration Services

35

auxiliary storage pool (ASP) 10

 

C

command, CL

Display Hardware Resources

(DSPHDWRSC)

22, 29

 

DSPHDWRSC (Display Hardware

Resources)

22, 29

 

 

Retrieve Configuration Source

(RTVCFGSRC)

22

 

 

RTVCFGSRC (Retrieve Configuration

Source)

22

 

 

 

 

considerations

12, 14

 

 

Consulting Services

36

 

 

CPF0975 message

25

 

 

customer’s upgrade needs

 

 

additional applications

7

 

expectations

7

 

 

 

financial considerations

7

 

new technology

7

 

 

problems

7

 

 

 

 

requirements

7

 

 

 

customer tasks

 

 

 

 

after hardware installed

24

 

before installing hardware

23

before upgrade takes place

20

current system preparation

18

when hardware arrives

18

 

D

data migration 1

Display Hardware Resources (DSPHDWRSC) command 22, 29

DSPHDWRSC (Display Hardware Resources) command 22, 29

F

Files Saved with Storage Free Specified 41

from models 4xx, 5xx, Sxx or 6xx to a 7xx 12

from models 6xx or 7xx to a 8xx 14

H

hardware investment 3

hardware service representative tasks 24

© Copyright IBM Corp. 1997, 2001

how long will the data migration take 5 how long will the upgrade take 3 How to Move Files That Have Been

Saved with Storage Free Specified 41

I

information ordering additional

preventive service planning 43 Installation Services 36

installing

from an alternate installation device considerations for placing an

order 11 installing the hardware 24 Interactive Specify codes, Sxx 13 iSeries Planning and Migration

Services 35

L

LPAR Planning and Implementation Services Offering 35

M

MES 3

MES upgrade 1 message

CPF0975 25

Midrange Enhanced Software Service 37 MRESS 37

N

Notices 45

O

ordering assistance 15 ordering prerequisites

hardware considerations 9 software items 9

system configurations considerations 9

ordering responsibilities 14 ordering specifications 11 ordering tasks

hardware 14 software 14

P

Performance Examinations 36 performing the upgrade

responsibilities 17 tasks 17

placing the order 14

planning your order 7 PowerPC 2, 3

preventive service planning information ordering 43

product support 35

R

recovery

SRC A900 2000 25 related support services 36 Retrieve Configuration Source

(RTVCFGSRC) command 22 return material equipment report

(RMER) 24 RISC 2, 3

RISC-to- RISC data migration 1 RISC-to-RISC upgrade 1 RTVCFGSRC (Retrieve Configuration

Source) command 22

S

sending the order 15

sending the order to other than IBM 15

services 9

 

 

software release to upgrade

5

SRC (system reference code)

 

A900 2000

25

 

recovery

25

 

Sxx Interactive Specify codes

13

system reference code (SRC)

 

A900 2000

25

 

recovery

25

 

U

upgrade overview 1

upgrades covered in this road map

models 170

1

models 2xx

1

models 6xx

1

models 7xx

1

models 8xx

1

models Sxx

1

upgrading

memory considerations 10

W

what is a data migration 3 what is an upgrade 2 why upgrade 2

49

Image 61
Contents ISeries 940x RISC-to-RISC Road Map Page ISeries 940x RISC-to-RISC Road Map Sixth Edition May Contents Iv iSeries 940x RISC-to-RISC Road Map V5R1 Who Should Read This Book ISeries 940x RISC-to-RISC Road Map, SA41-5155-05Conventions and Terminology Used in This Book V4R4M0 Prerequisite and related information Under the System Planning and Installation topicOperations Navigator How to send your commentsISeries 940x RISC-to-RISC Road Map, SA41-5155-05 ISeries 940x RISC-to-RISC Road Map V5R1 What is in this Road Map? Overview of RISC-to-RISC Upgrades and Data MigrationsUpgrade process flow What is an Upgrade?What is a Data Migration? How Long will the Upgrade Take?Hardware Investment for Upgrading Data migration process flow How Long will the Data Migration Take? Books to Use for Software Release UpgradesISeries 940x RISC-to-RISC Road Map V5R1 Planning Your Order for Upgrading or Data Migration Determining Your Upgrade NeedsHow to Gather Performance Information How to Gather Configuration InformationVersion 4 Software Items Prerequisites Before Placing an OrderOther Software Related Items Hardware ConsiderationsServices and Other Assistance System Configuration ConsiderationsModel-specific Considerations for Placing an Order Upgrading from a 4xx, 5xx, Sxx, or 6xx to a Migrating from a 5xx to an Who is Responsible for Ordering the Upgrade? Placing the Upgrade OrderUpgrading from a 6xx or 7xx to an Sending the Order to a Software Service Provider Other Than How to Get Help with the OrderSending the Order to IBM ISeries 940x RISC-to-RISC Road Map V5R1 Who is Responsible for Upgrading the System Procedure for an Upgrade RISC-to-RISCPreparing the Current System What to Do When the Hardware ArrivesThis is where you load the new operating system Preparing for System Assurance prior to hardware upgrade Print Disk Configuration Status of the installed system ISeries 940x RISC-to-RISC Road Map V5R1 System Assurance Checkpoint Managing your new system I/O resources Installing the Hardware for the RISC-to-RISC UpgradeInformation Center under System planning and installation ISeries 940x RISC-to-RISC Road Map V5R1 Change Description Label display appears Perform a normal IPL Performing a new system backupProcedure for an Upgrade RISC-to-RISC Systems Management Work management- Work Management Manuals Prerequisites for data migration Risc to Risc Procedure for a Data Migration RISC-to-RISCPreparing the source system for the migration Data migration RISC-to-RISC Procedure for a Data Migration RISC-to-RISC ISeries 940x RISC-to-RISC Road Map V5R1 ISeries and AS/400 Data Migration Services Appendix A. AS/400 Global ServicesLpar Planning and Implementation Services ISeries Planning and Migration ServicesAS/400 Solution Services Installation Services Related Support ServicesConsulting Services Performance ExaminationsMidrange Enhanced Software Service Mress ISeries 940x RISC-to-RISC Road Map V5R1 IBM Http Server for AS/400 Appendix B. Considerations and SolutionsOperations Console OptiConnect SRC A900 2000 RecoveryIntegrated Netfinity Server Clustering and Logical PartitionsHow to Move Freed Database Files without New Members Command to restore the file. For a logical file, use PTF ISeries 940x RISC-to-RISC Road Map V5R1 Appendix D. Notices IBM TrademarksAppendix D. Notices ISeries 940x RISC-to-RISC Road Map V5R1 Rtvcfgsrc IndexISeries 940x RISC-to-RISC Road Map V5R1 How satisfied are you that the information in this book is Readers’ Comments We’d Like to Hear from YouBusiness Reply Mail Page SA41-5155-05