IBM SA41-5155-05 manual System Assurance Checkpoint

Page 35

__ 9. Print the status of all PTFs on the system (each system partition if LPAR) after installing the V5R1 software and before the hardware upgrade. Type the following command:

DSPPTF LICPGM(*ALL) OUTPUT(*PRINT)

System Assurance Checkpoint

The customer needs to ensure that the following is completed before the hardware service representative arrives:

1.Verify that the physical planning items were completed:

vHigh Speed Link cable diagram

vFloor plan, system layout diagram

vCable labelling

To complete the items, see the Physical Planning in the iSeries Information Center under Getting Started with iSeries -> Planning ->Physical planning for your new system.

http://www.ibm.com/eserver/iseries/infocenter

2.Ensure that you have installed the latest V5R1 cumulative PTF package and specific software release PTFs on all partitions. Refer to step 7 on page 19.

3.Verify that you have the latest full system backup (Save option 21) tapes on hand and labeled. Refer to step 4 on page 21.

4.Verify the availability of a compatible alternate IPL device (CD-ROM or tape unit attached to the system bus 1). If the system uses an alternate installation device (CD-ROM, DVD, or tape unit attached to a bus other than the system bus 1) for installation or restore operations, ensure the availability of the location information for that device.

Note: If a tape unit is attached to a bus other than the system bus 1, record the following information about the tape unit location:

vType and model

vSystem bus

vSystem card

This information is necessary to set up and enable the tape unit as an alternate installation device. For more information about alternate installation devices, go to the Software Installation manual. A PDF version of this manual is available from the iSeries Information Center under

System planning and installation -> Hardware and software ->

Software and licensed programs -> Install software.

5.Ensure that the console device is available and ready. For information about setting up and configuring Operations Console, see the manual Operations Console Setup, SC41-5508-02. A PDF version of this manual is available from the iSeries Information Center under Client Access Express -> Manuals and Redbooks.

6.Verify that you have the following printouts on hand (refer to step 1 on page 20 through step 9):

v Latest system configuration list

vLatest device descriptions printout on hand

vLatest controller descriptions printout on hand

vLatest PTF level printout on hand

vLatest complete and accurate label location chart or worksheet on hand

Chapter 3. Procedure for an Upgrade (RISC-to-RISC) 23

Image 35
Contents ISeries 940x RISC-to-RISC Road Map Page ISeries 940x RISC-to-RISC Road Map Sixth Edition May Contents Iv iSeries 940x RISC-to-RISC Road Map V5R1 Conventions and Terminology Used in This Book ISeries 940x RISC-to-RISC Road Map, SA41-5155-05Who Should Read This Book V4R4M0 Prerequisite and related information Under the System Planning and Installation topicOperations Navigator How to send your commentsISeries 940x RISC-to-RISC Road Map, SA41-5155-05 ISeries 940x RISC-to-RISC Road Map V5R1 What is in this Road Map? Overview of RISC-to-RISC Upgrades and Data MigrationsUpgrade process flow What is an Upgrade?Hardware Investment for Upgrading How Long will the Upgrade Take?What is a Data Migration? Data migration process flow How Long will the Data Migration Take? Books to Use for Software Release UpgradesISeries 940x RISC-to-RISC Road Map V5R1 Planning Your Order for Upgrading or Data Migration Determining Your Upgrade NeedsHow to Gather Performance Information How to Gather Configuration InformationHardware Considerations Prerequisites Before Placing an OrderVersion 4 Software Items Other Software Related ItemsServices and Other Assistance System Configuration ConsiderationsModel-specific Considerations for Placing an Order Upgrading from a 4xx, 5xx, Sxx, or 6xx to a Migrating from a 5xx to an Upgrading from a 6xx or 7xx to an Placing the Upgrade OrderWho is Responsible for Ordering the Upgrade? Sending the Order to IBM How to Get Help with the OrderSending the Order to a Software Service Provider Other Than ISeries 940x RISC-to-RISC Road Map V5R1 Who is Responsible for Upgrading the System Procedure for an Upgrade RISC-to-RISCPreparing the Current System What to Do When the Hardware ArrivesThis is where you load the new operating system Preparing for System Assurance prior to hardware upgrade Print Disk Configuration Status of the installed system ISeries 940x RISC-to-RISC Road Map V5R1 System Assurance Checkpoint Managing your new system I/O resources Installing the Hardware for the RISC-to-RISC UpgradeInformation Center under System planning and installation ISeries 940x RISC-to-RISC Road Map V5R1 Change Description Label display appears Perform a normal IPL Performing a new system backupProcedure for an Upgrade RISC-to-RISC Systems Management Work management- Work Management Manuals Preparing the source system for the migration Procedure for a Data Migration RISC-to-RISCPrerequisites for data migration Risc to Risc Data migration RISC-to-RISC Procedure for a Data Migration RISC-to-RISC ISeries 940x RISC-to-RISC Road Map V5R1 ISeries Planning and Migration Services Appendix A. AS/400 Global ServicesISeries and AS/400 Data Migration Services Lpar Planning and Implementation ServicesPerformance Examinations Related Support ServicesAS/400 Solution Services Installation Services Consulting ServicesMidrange Enhanced Software Service Mress ISeries 940x RISC-to-RISC Road Map V5R1 IBM Http Server for AS/400 Appendix B. Considerations and SolutionsClustering and Logical Partitions SRC A900 2000 RecoveryOperations Console OptiConnect Integrated Netfinity ServerHow to Move Freed Database Files without New Members Command to restore the file. For a logical file, use PTF ISeries 940x RISC-to-RISC Road Map V5R1 Appendix D. Notices IBM TrademarksAppendix D. Notices ISeries 940x RISC-to-RISC Road Map V5R1 Rtvcfgsrc IndexISeries 940x RISC-to-RISC Road Map V5R1 How satisfied are you that the information in this book is Readers’ Comments We’d Like to Hear from YouBusiness Reply Mail Page SA41-5155-05