Chapter 2. Planning Your Order for Upgrading or Data Migration

Review this chapter as you identify a solution and again after a decision is made to verify the accuracy and completeness of the order. After you finish reviewing this chapter, you should have the following:

vFinal software order

vFinal hardware order

vFloor layout

vHigh-speed link (HSL) and system power control network (SPCN) plan

vCable labelling of source system

vSite requirements defined

Refer to the “Upgrade process flow” on page 2 or “Data migration process flow” on page 4, depending on your situation, to identify where Planning is in the overall process.

Determining Your Upgrade Needs

To help determine the upgrade needs, please consider the following:

vWhat problems does this upgrade need to address?

vWhat additional applications or growth do you expect or plan for in the future?

vWhat new technology do you want as part of the upgrade?

vWhat are the requirements for the following:

Capacity

Capability

Performance

Availability

vWhat are your expectations for the following:

Impact on business operations

Cost

Performance

vWhat are the financial considerations to keep in mind? For example:

Government discounts

Capital planning cycles

Tax implications

Budget

Performance Tools for Capacity Planning and Performance Analysis

The licensed program Performance Tools/400 (Program 57xx-PT1) and QSIZE400 on the iSeries 400 configurator can be used for capacity planning and performance analysis.

The BEST**/1 Capacity Planning function of the Performance Tools licensed program provides the capability to analyze how a different AS/400 or iSeries 400

© Copyright IBM Corp. 1997, 2001

7

Image 19
Contents ISeries 940x RISC-to-RISC Road Map Page ISeries 940x RISC-to-RISC Road Map Sixth Edition May Contents Iv iSeries 940x RISC-to-RISC Road Map V5R1 Who Should Read This Book ISeries 940x RISC-to-RISC Road Map, SA41-5155-05Conventions and Terminology Used in This Book V4R4M0 Prerequisite and related information Under the System Planning and Installation topicOperations Navigator How to send your commentsISeries 940x RISC-to-RISC Road Map, SA41-5155-05 ISeries 940x RISC-to-RISC Road Map V5R1 What is in this Road Map? Overview of RISC-to-RISC Upgrades and Data MigrationsUpgrade process flow What is an Upgrade?What is a Data Migration? How Long will the Upgrade Take?Hardware Investment for Upgrading Data migration process flow How Long will the Data Migration Take? Books to Use for Software Release UpgradesISeries 940x RISC-to-RISC Road Map V5R1 Planning Your Order for Upgrading or Data Migration Determining Your Upgrade NeedsHow to Gather Performance Information How to Gather Configuration InformationHardware Considerations Prerequisites Before Placing an OrderVersion 4 Software Items Other Software Related ItemsServices and Other Assistance System Configuration ConsiderationsModel-specific Considerations for Placing an Order Upgrading from a 4xx, 5xx, Sxx, or 6xx to a Migrating from a 5xx to an Who is Responsible for Ordering the Upgrade? Placing the Upgrade OrderUpgrading from a 6xx or 7xx to an Sending the Order to a Software Service Provider Other Than How to Get Help with the OrderSending the Order to IBM ISeries 940x RISC-to-RISC Road Map V5R1 Who is Responsible for Upgrading the System Procedure for an Upgrade RISC-to-RISCPreparing the Current System What to Do When the Hardware ArrivesThis is where you load the new operating system Preparing for System Assurance prior to hardware upgrade Print Disk Configuration Status of the installed system ISeries 940x RISC-to-RISC Road Map V5R1 System Assurance Checkpoint Managing your new system I/O resources Installing the Hardware for the RISC-to-RISC UpgradeInformation Center under System planning and installation ISeries 940x RISC-to-RISC Road Map V5R1 Change Description Label display appears Perform a normal IPL Performing a new system backupProcedure for an Upgrade RISC-to-RISC Systems Management Work management- Work Management Manuals Prerequisites for data migration Risc to Risc Procedure for a Data Migration RISC-to-RISCPreparing the source system for the migration Data migration RISC-to-RISC Procedure for a Data Migration RISC-to-RISC ISeries 940x RISC-to-RISC Road Map V5R1 ISeries Planning and Migration Services Appendix A. AS/400 Global ServicesISeries and AS/400 Data Migration Services Lpar Planning and Implementation ServicesPerformance Examinations Related Support ServicesAS/400 Solution Services Installation Services Consulting ServicesMidrange Enhanced Software Service Mress ISeries 940x RISC-to-RISC Road Map V5R1 IBM Http Server for AS/400 Appendix B. Considerations and SolutionsClustering and Logical Partitions SRC A900 2000 RecoveryOperations Console OptiConnect Integrated Netfinity ServerHow to Move Freed Database Files without New Members Command to restore the file. For a logical file, use PTF ISeries 940x RISC-to-RISC Road Map V5R1 Appendix D. Notices IBM TrademarksAppendix D. Notices ISeries 940x RISC-to-RISC Road Map V5R1 Rtvcfgsrc IndexISeries 940x RISC-to-RISC Road Map V5R1 How satisfied are you that the information in this book is Readers’ Comments We’d Like to Hear from YouBusiness Reply Mail Page SA41-5155-05