IBM SA41-5155-05 manual Performing a new system backup, Perform a normal IPL

Page 40

Performing a new system backup

__ 1. Perform a normal IPL:

No LPAR

LPAR Primary Partition

LPAR Secondary Partition

Perform the following:

Perform the steps in the No

Perform the steps in the No

a. Make sure that the

LPAR column after verifying

LPAR column (set partitions

that all secondary partitions

to B Normal mode, and then

system is set to B and

are powered down.

power down and perform an

Normal (N) mode before

 

IPL on the partitions), using

performing the power

For information about

appropriate LPAR service

down and subsequent

powering down a system,

tool steps, only after

IPL of the system.

see the Powering down a

successfully performing a

b. Once the system is set to

system with logical

normal IPL of the primary

B and Normal mode,

partitions topic in the

partition.

follow these steps:

Information Center under

 

 

 

 

1)

Type PWRDWNSYS on

Systems Management ->

For instructions on setting

 

the command line

Logical partitions ->

the IPL mode, powering

 

and prompt on the

Managing logical partitions

down, and performing an

 

command (Press F4). -> Restarting and powering

IPL on secondary partitions,

2)

Make sure that you

down a system with logical

see the Restarting and

partitions.

powering down a system

 

select these options

 

 

with logical partitions

 

for the PWRDWNSYS

 

 

 

topic in the Information

 

command:

 

 

 

Center under Systems

 

v For How to end,

 

 

 

Management -> Logical

 

*CNTRLD

 

 

 

partitions -> Managing

 

v For Delay time, if

 

 

 

logical partitions.

 

*CNTRLD, 3600

 

 

 

(use the default

 

 

 

value, in seconds,

 

 

 

or the value that

 

 

 

you consider

 

 

 

appropriate given

 

 

 

your software and

 

 

 

system settings)

 

 

vFor Restart after power down, *YES

vFor IPL Source,

*PANEL

SRC A900 2000 should not appear on the control panel when the IPL completes. If SRC A900 2000 does appear and you are using Operations Console, you must perform an IPL in Manual mode (M) on the system to arrive at the Dedicated Service Tools (DST). Then, in DST, set the console mode system value to Operations Console, and continue the IPL to sign on.

To set the system to manual mode, do the following:

vFor systems without logical partitions, see the Changing operating modes and IPL types topic in the Information Center under System hardware -> Restarting the system (IPL) -> IPL type.

vFor systems with logical partitions, see the Changing operating mode for a logical partition topic in the Information Center under Systems

Management -> Logical partitions -> Managing logical partitions -> Restarting and powering down a system with logical partitions.

28iSeries 940x RISC-to-RISC Road Map V5R1

Image 40
Contents ISeries 940x RISC-to-RISC Road Map Page ISeries 940x RISC-to-RISC Road Map Sixth Edition May Contents Iv iSeries 940x RISC-to-RISC Road Map V5R1 Who Should Read This Book ISeries 940x RISC-to-RISC Road Map, SA41-5155-05Conventions and Terminology Used in This Book V4R4M0 Under the System Planning and Installation topic Prerequisite and related informationHow to send your comments Operations NavigatorISeries 940x RISC-to-RISC Road Map, SA41-5155-05 ISeries 940x RISC-to-RISC Road Map V5R1 Overview of RISC-to-RISC Upgrades and Data Migrations What is in this Road Map?What is an Upgrade? Upgrade process flowWhat is a Data Migration? How Long will the Upgrade Take?Hardware Investment for Upgrading Data migration process flow Books to Use for Software Release Upgrades How Long will the Data Migration Take?ISeries 940x RISC-to-RISC Road Map V5R1 Determining Your Upgrade Needs Planning Your Order for Upgrading or Data MigrationHow to Gather Configuration Information How to Gather Performance InformationPrerequisites Before Placing an Order Version 4 Software ItemsOther Software Related Items Hardware ConsiderationsSystem Configuration Considerations Services and Other AssistanceModel-specific Considerations for Placing an Order Upgrading from a 4xx, 5xx, Sxx, or 6xx to a Migrating from a 5xx to an Who is Responsible for Ordering the Upgrade? Placing the Upgrade OrderUpgrading from a 6xx or 7xx to an Sending the Order to a Software Service Provider Other Than How to Get Help with the OrderSending the Order to IBM ISeries 940x RISC-to-RISC Road Map V5R1 Procedure for an Upgrade RISC-to-RISC Who is Responsible for Upgrading the SystemWhat to Do When the Hardware Arrives Preparing the Current SystemThis is where you load the new operating system Preparing for System Assurance prior to hardware upgrade Print Disk Configuration Status of the installed system ISeries 940x RISC-to-RISC Road Map V5R1 System Assurance Checkpoint Installing the Hardware for the RISC-to-RISC Upgrade Managing your new system I/O resourcesInformation Center under System planning and installation ISeries 940x RISC-to-RISC Road Map V5R1 Change Description Label display appears Performing a new system backup Perform a normal IPLProcedure for an Upgrade RISC-to-RISC Systems Management Work management- Work Management Manuals Prerequisites for data migration Risc to Risc Procedure for a Data Migration RISC-to-RISCPreparing the source system for the migration Data migration RISC-to-RISC Procedure for a Data Migration RISC-to-RISC ISeries 940x RISC-to-RISC Road Map V5R1 Appendix A. AS/400 Global Services ISeries and AS/400 Data Migration ServicesLpar Planning and Implementation Services ISeries Planning and Migration ServicesRelated Support Services AS/400 Solution Services Installation ServicesConsulting Services Performance ExaminationsMidrange Enhanced Software Service Mress ISeries 940x RISC-to-RISC Road Map V5R1 Appendix B. Considerations and Solutions IBM Http Server for AS/400SRC A900 2000 Recovery Operations Console OptiConnectIntegrated Netfinity Server Clustering and Logical PartitionsHow to Move Freed Database Files without New Members Command to restore the file. For a logical file, use PTF ISeries 940x RISC-to-RISC Road Map V5R1 Appendix D. Notices Trademarks IBMAppendix D. Notices ISeries 940x RISC-to-RISC Road Map V5R1 Index RtvcfgsrcISeries 940x RISC-to-RISC Road Map V5R1 Readers’ Comments We’d Like to Hear from You How satisfied are you that the information in this book isBusiness Reply Mail Page SA41-5155-05