IBM SA41-5155-05 manual Appendix B. Considerations and Solutions, IBM Http Server for AS/400

Page 51

Appendix B. Considerations and Solutions

See the AS/400 Homepage, AS/400 Information Center for further information regarding your concerns.

http://www.as400.ibm.com

http://www.as400.ibm.com/infocenter

http://www.ibm.com/eserver/iseries/infocenter

IBM HTTP Server for AS/400

When migrating your AS/400 system from V3R7 to V4R2, some existing common gateway interface, CGI programs may not function correctly. The CGI interface in V4R2 was changed to improve performance.

What was the change?

The AS/400 runtime environment now allows the IBM HTTP Server for AS/400 to put into effect byte streams for CGI standard in and standard out.

Why was the change made?

Customer requirements caused this change to remove the line length limitations on, (standard in and standard out).

What problems were detected or flagged?

1.Programs that call QtmhRdStdin multiple times to read the standard in data are incorrect, and this does not work.

2.All programs that read from (standard in), (QtmhRdSdtin) need to check the Content-Length environment variable to determine the number of bytes to read. Programs that do not use the Content-Length environment variable and read more than the Content-Length will not work.

Why was the change made?

Customer requirements to remove the 250 byte limit on standard in and standard out, motivated the change.

When was the change made?

The change is available via the following PTFs:

vV4R1 - 5769SS1 SF46810

v5769TC1 SF47332

vV4R2 - 5769TC1 SF46558

What should the customer do?

The customer should use the Web Programming Guide to ensure that the programs meet standard guidelines.

© Copyright IBM Corp. 1997, 2001

39

Image 51
Contents ISeries 940x RISC-to-RISC Road Map Page ISeries 940x RISC-to-RISC Road Map Sixth Edition May Contents Iv iSeries 940x RISC-to-RISC Road Map V5R1 ISeries 940x RISC-to-RISC Road Map, SA41-5155-05 Who Should Read This BookConventions and Terminology Used in This Book V4R4M0 Prerequisite and related information Under the System Planning and Installation topicOperations Navigator How to send your commentsISeries 940x RISC-to-RISC Road Map, SA41-5155-05 ISeries 940x RISC-to-RISC Road Map V5R1 What is in this Road Map? Overview of RISC-to-RISC Upgrades and Data MigrationsUpgrade process flow What is an Upgrade?How Long will the Upgrade Take? What is a Data Migration?Hardware Investment for Upgrading Data migration process flow How Long will the Data Migration Take? Books to Use for Software Release UpgradesISeries 940x RISC-to-RISC Road Map V5R1 Planning Your Order for Upgrading or Data Migration Determining Your Upgrade NeedsHow to Gather Performance Information How to Gather Configuration InformationHardware Considerations Prerequisites Before Placing an OrderVersion 4 Software Items Other Software Related ItemsServices and Other Assistance System Configuration ConsiderationsModel-specific Considerations for Placing an Order Upgrading from a 4xx, 5xx, Sxx, or 6xx to a Migrating from a 5xx to an Placing the Upgrade Order Who is Responsible for Ordering the Upgrade?Upgrading from a 6xx or 7xx to an How to Get Help with the Order Sending the Order to a Software Service Provider Other ThanSending the Order to IBM ISeries 940x RISC-to-RISC Road Map V5R1 Who is Responsible for Upgrading the System Procedure for an Upgrade RISC-to-RISCPreparing the Current System What to Do When the Hardware ArrivesThis is where you load the new operating system Preparing for System Assurance prior to hardware upgrade Print Disk Configuration Status of the installed system ISeries 940x RISC-to-RISC Road Map V5R1 System Assurance Checkpoint Managing your new system I/O resources Installing the Hardware for the RISC-to-RISC UpgradeInformation Center under System planning and installation ISeries 940x RISC-to-RISC Road Map V5R1 Change Description Label display appears Perform a normal IPL Performing a new system backupProcedure for an Upgrade RISC-to-RISC Systems Management Work management- Work Management Manuals Procedure for a Data Migration RISC-to-RISC Prerequisites for data migration Risc to RiscPreparing the source system for the migration Data migration RISC-to-RISC Procedure for a Data Migration RISC-to-RISC ISeries 940x RISC-to-RISC Road Map V5R1 ISeries Planning and Migration Services Appendix A. AS/400 Global ServicesISeries and AS/400 Data Migration Services Lpar Planning and Implementation ServicesPerformance Examinations Related Support ServicesAS/400 Solution Services Installation Services Consulting ServicesMidrange Enhanced Software Service Mress ISeries 940x RISC-to-RISC Road Map V5R1 IBM Http Server for AS/400 Appendix B. Considerations and SolutionsClustering and Logical Partitions SRC A900 2000 RecoveryOperations Console OptiConnect Integrated Netfinity ServerHow to Move Freed Database Files without New Members Command to restore the file. For a logical file, use PTF ISeries 940x RISC-to-RISC Road Map V5R1 Appendix D. Notices IBM TrademarksAppendix D. Notices ISeries 940x RISC-to-RISC Road Map V5R1 Rtvcfgsrc IndexISeries 940x RISC-to-RISC Road Map V5R1 How satisfied are you that the information in this book is Readers’ Comments We’d Like to Hear from YouBusiness Reply Mail Page SA41-5155-05