Chapter 3. Procedure for an Upgrade (RISC-to-RISC)

After you finish reviewing this chapter, you should have performed the upgrade tasks and obtained the outputs outlined in the “Upgrade process flow” on page 2 (except for the planning tasks and outputs already covered in “Chapter 2. Planning Your Order for Upgrading or Data Migration” on page 7).

Who is Responsible for Upgrading the System

The following table establishes a check-off list for task responsibilities in preparation for and during the upgrade. The list is arranged in the sequence the tasks should be done.

IBM Services can be provided for additional cost to assist customers.

For customer install systems and servers such as Model 170, follow the instructions that came with the system.

Table 4. Tasks and Responsibilities for the Upgrade Path

Checkoff

Task

Person Responsible

 

 

 

 

Consider needs for installation

Customer, Business Partner, Software

 

 

Service Representative, Hardware Service

 

 

Representative

 

 

 

 

Establish tentative installation date

Customer and their authorized

 

 

representative

 

 

 

 

Read preventive service planning (PSP) information

Customer

 

 

 

 

Save the system, full save

Customer

 

 

 

 

Install Target Software Release and appropriate PTFs

Customer

 

 

 

 

Verify that all applications are running

Customer

 

 

 

 

Record performance and evaluate

Customer

 

 

 

 

Complete physical planning

Customer

 

 

 

 

Save the system, full save

Customer

 

 

 

 

Contact customer Hardware Service Representative and

Customer

 

schedule the upgrade after the order arrives

 

 

 

 

 

System Assurance

Hardware Service Representative

 

Verify the following:

 

 

v Prerequisite Engineering Changes are installed

 

 

v Customer has installed all required PTFs

 

 

v Correct operating system level

 

 

v Customer has backed up the system, including all

 

 

customer data

 

 

 

 

 

Inventory parts received from IBM as part of the upgrade

Hardware Service Representative

 

 

 

 

Run Work with Hardware Products (WRKHDWPRD)

Hardware Service Representative

 

command option 4

 

 

 

 

 

Upgrade hardware using parts shipped from IBM and the

Hardware Service Representative

 

CUII

 

 

 

 

© Copyright IBM Corp. 1997, 2001

17

Image 29
Contents ISeries 940x RISC-to-RISC Road Map Page ISeries 940x RISC-to-RISC Road Map Sixth Edition May Contents Iv iSeries 940x RISC-to-RISC Road Map V5R1 Conventions and Terminology Used in This Book ISeries 940x RISC-to-RISC Road Map, SA41-5155-05Who Should Read This Book V4R4M0 Prerequisite and related information Under the System Planning and Installation topicOperations Navigator How to send your commentsISeries 940x RISC-to-RISC Road Map, SA41-5155-05 ISeries 940x RISC-to-RISC Road Map V5R1 What is in this Road Map? Overview of RISC-to-RISC Upgrades and Data MigrationsUpgrade process flow What is an Upgrade?Hardware Investment for Upgrading How Long will the Upgrade Take?What is a Data Migration? Data migration process flow How Long will the Data Migration Take? Books to Use for Software Release UpgradesISeries 940x RISC-to-RISC Road Map V5R1 Planning Your Order for Upgrading or Data Migration Determining Your Upgrade NeedsHow to Gather Performance Information How to Gather Configuration InformationVersion 4 Software Items Prerequisites Before Placing an OrderOther Software Related Items Hardware ConsiderationsServices and Other Assistance System Configuration ConsiderationsModel-specific Considerations for Placing an Order Upgrading from a 4xx, 5xx, Sxx, or 6xx to a Migrating from a 5xx to an Upgrading from a 6xx or 7xx to an Placing the Upgrade OrderWho is Responsible for Ordering the Upgrade? Sending the Order to IBM How to Get Help with the OrderSending the Order to a Software Service Provider Other Than ISeries 940x RISC-to-RISC Road Map V5R1 Who is Responsible for Upgrading the System Procedure for an Upgrade RISC-to-RISCPreparing the Current System What to Do When the Hardware ArrivesThis is where you load the new operating system Preparing for System Assurance prior to hardware upgrade Print Disk Configuration Status of the installed system ISeries 940x RISC-to-RISC Road Map V5R1 System Assurance Checkpoint Managing your new system I/O resources Installing the Hardware for the RISC-to-RISC UpgradeInformation Center under System planning and installation ISeries 940x RISC-to-RISC Road Map V5R1 Change Description Label display appears Perform a normal IPL Performing a new system backupProcedure for an Upgrade RISC-to-RISC Systems Management Work management- Work Management Manuals Preparing the source system for the migration Procedure for a Data Migration RISC-to-RISCPrerequisites for data migration Risc to Risc Data migration RISC-to-RISC Procedure for a Data Migration RISC-to-RISC ISeries 940x RISC-to-RISC Road Map V5R1 ISeries and AS/400 Data Migration Services Appendix A. AS/400 Global ServicesLpar Planning and Implementation Services ISeries Planning and Migration ServicesAS/400 Solution Services Installation Services Related Support ServicesConsulting Services Performance ExaminationsMidrange Enhanced Software Service Mress ISeries 940x RISC-to-RISC Road Map V5R1 IBM Http Server for AS/400 Appendix B. Considerations and SolutionsOperations Console OptiConnect SRC A900 2000 RecoveryIntegrated Netfinity Server Clustering and Logical PartitionsHow to Move Freed Database Files without New Members Command to restore the file. For a logical file, use PTF ISeries 940x RISC-to-RISC Road Map V5R1 Appendix D. Notices IBM TrademarksAppendix D. Notices ISeries 940x RISC-to-RISC Road Map V5R1 Rtvcfgsrc IndexISeries 940x RISC-to-RISC Road Map V5R1 How satisfied are you that the information in this book is Readers’ Comments We’d Like to Hear from YouBusiness Reply Mail Page SA41-5155-05