v_ Verified the availability of a compatible alternate IPL device (tape unit attached to the system bus 1). If the system uses an alternate installation device for install or restore operations, ensure the availability of the location information for that device.

Data migration (RISC-to-RISC)

__ 1. Using the Backup and Recovery book, Chapter 4, checklist 20 steps 1 through 9, perform a recovery after a complete system loss. Include the following additions before the IPL. The Backup and Recovery manual, SC41-5304-05, is available in PDF format from the Information Center under Systems Management -> Backup, recovery, and availability -> Manuals and Redbooks.

__ 2. Rename or replace the hardware descriptions on the target system.

a.On the command line, type WRKHDWPRD and press the Enter key.

b.Select the Change description label locations option. Press the Enter key.

c.If a controller or device no longer has a valid resource on the system, the Using Change Description Label Locations display appears, allowing you to make corrections.

d.Determine whether the new target system has different communications lines or storage than the source system. If so, check the work management objects. For more information, see the Work management topic under Systems Management in the Information Center.

__ 3. Install any new LPPs or PTFs. For more information, refer to the Software Installation book.

__ 4. Change the QAUTOCFG, QIPLTYPE, and QPFRADJ system values to the desired values. For more details, refer to the book Basic System Operation, Administration, and Problem Handling , SC41-5206-03.

Verify that all objects were restored from the source system. Use the Backup and Recovery book to fix any discrepancies.

__ 5. Perform an IPL.

__ 6. Print a copy of your system configuration information:

v_ Generate reports of the hardware and configuration objects by issuing the following command:

PRTSYSINF

v_ Print the spooled file that was generated by the above command.

v_ Print a new system configuration list using Start a service tool option. To do this complete the following steps on the AS/400 Main menu command line:

a.Start System Service Tools by entering:

STRSST

b.On the STRSST display, select Start a service tool option. Press the Enter key.

c.On the Start a Service Tool display, select Hardware service manager. Press the Enter key.

d.From the Hardware Service Manager display, press F6 (print configuration).

e.Your system configuration should print. Keep the list for future reference.

32iSeries 940x RISC-to-RISC Road Map V5R1

Image 44
Contents ISeries 940x RISC-to-RISC Road Map Page ISeries 940x RISC-to-RISC Road Map Sixth Edition May Contents Iv iSeries 940x RISC-to-RISC Road Map V5R1 Conventions and Terminology Used in This Book ISeries 940x RISC-to-RISC Road Map, SA41-5155-05Who Should Read This Book V4R4M0 Under the System Planning and Installation topic Prerequisite and related informationHow to send your comments Operations NavigatorISeries 940x RISC-to-RISC Road Map, SA41-5155-05 ISeries 940x RISC-to-RISC Road Map V5R1 Overview of RISC-to-RISC Upgrades and Data Migrations What is in this Road Map?What is an Upgrade? Upgrade process flowHardware Investment for Upgrading How Long will the Upgrade Take?What is a Data Migration? Data migration process flow Books to Use for Software Release Upgrades How Long will the Data Migration Take?ISeries 940x RISC-to-RISC Road Map V5R1 Determining Your Upgrade Needs Planning Your Order for Upgrading or Data MigrationHow to Gather Configuration Information How to Gather Performance InformationPrerequisites Before Placing an Order Version 4 Software ItemsOther Software Related Items Hardware ConsiderationsSystem Configuration Considerations Services and Other AssistanceModel-specific Considerations for Placing an Order Upgrading from a 4xx, 5xx, Sxx, or 6xx to a Migrating from a 5xx to an Upgrading from a 6xx or 7xx to an Placing the Upgrade OrderWho is Responsible for Ordering the Upgrade? Sending the Order to IBM How to Get Help with the OrderSending the Order to a Software Service Provider Other Than ISeries 940x RISC-to-RISC Road Map V5R1 Procedure for an Upgrade RISC-to-RISC Who is Responsible for Upgrading the SystemWhat to Do When the Hardware Arrives Preparing the Current SystemThis is where you load the new operating system Preparing for System Assurance prior to hardware upgrade Print Disk Configuration Status of the installed system ISeries 940x RISC-to-RISC Road Map V5R1 System Assurance Checkpoint Installing the Hardware for the RISC-to-RISC Upgrade Managing your new system I/O resourcesInformation Center under System planning and installation ISeries 940x RISC-to-RISC Road Map V5R1 Change Description Label display appears Performing a new system backup Perform a normal IPLProcedure for an Upgrade RISC-to-RISC Systems Management Work management- Work Management Manuals Preparing the source system for the migration Procedure for a Data Migration RISC-to-RISCPrerequisites for data migration Risc to Risc Data migration RISC-to-RISC Procedure for a Data Migration RISC-to-RISC ISeries 940x RISC-to-RISC Road Map V5R1 Appendix A. AS/400 Global Services ISeries and AS/400 Data Migration ServicesLpar Planning and Implementation Services ISeries Planning and Migration ServicesRelated Support Services AS/400 Solution Services Installation ServicesConsulting Services Performance ExaminationsMidrange Enhanced Software Service Mress ISeries 940x RISC-to-RISC Road Map V5R1 Appendix B. Considerations and Solutions IBM Http Server for AS/400SRC A900 2000 Recovery Operations Console OptiConnectIntegrated Netfinity Server Clustering and Logical PartitionsHow to Move Freed Database Files without New Members Command to restore the file. For a logical file, use PTF ISeries 940x RISC-to-RISC Road Map V5R1 Appendix D. Notices Trademarks IBMAppendix D. Notices ISeries 940x RISC-to-RISC Road Map V5R1 Index RtvcfgsrcISeries 940x RISC-to-RISC Road Map V5R1 Readers’ Comments We’d Like to Hear from You How satisfied are you that the information in this book isBusiness Reply Mail Page SA41-5155-05