Omnimount UL10378, Power55 manual Vesa Monitor Installation

Page 26

VESA MONITOR INSTALLATION

EN

Punch out perforated lines to access horizontal rail screws (12).

ES

Troquele las líneas perforadas para acceder a los tornillos del raíl horizontal (12).

FR

Découpez les lignes perforées pour accéder aux vis (12) du rail horizontal.

DE

Stanzen Sie die perforierten Linien aus, um Zugriff auf die Schrauben der horizontalen Schienen (12) zu erhalten.

NL

Druk de geperforeerde lijnen in om bij de schroeven (12) van de horizontale stang te komen.

IT

Premere sulle linee perforate per accedere alle viti delle guide orizzontali (12).

RU

Выбейте перфорированные элементы для доступа к винтам горизонтальных направляющих (12).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

12

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EN

Partially Loosen

ES

Parcialmente flojo

FR

Dévisser partiellement

DE

Teilweise lösen

NL

Maak gedeeltelijk los

IT

Allentare parzialmente

RU

Ослабьте частично

12

P26

Image 26
Contents PN # Images may differ from actual product¡ADVERTENCIA! Español AVERTISSEMENT! FrançaisAVVERTENZA! Italiano WARNUNG! DeutschWAARSCHUWING! Nederlands ПРЕДОСТЕРЕЖЕНИЕ! РусскийTable of Contents Weight Capacity 110lbsContents Monitor Kit Power M-B M-C M-D M-E M-F M-G M-H M-I M-JSymbol KEY Suchen Sie den Balken und markieren Sie Ränder und Mitte Wood Stud InstallationFind studs and mark edge and center locations Zoek de drager en markeer de rand- en middenlocatiesДля разметки места крепежа используйте стеновую пластину Wood Stud InstallationUse wall plate or wall template to mark mounting locations Stud #1 must be positioned in Section a Left RightWall Template Stud #2 must be positioned in Section B-RightWood Pilot Inch 55 mmP13 Concrete Installation Solid Concrete Only Do Not Drill Into MortarWall Template 2 for further instructions Concrete InstallationLeft Right Concrete Pilot Inch 8 inch 55 mm Not IncludedTighten Fastener READ!!! Slim TV 6 cm thickness or less only Non Vesa Install Continue… Vesa Go To NON-VESA / Larger Monitor Installation NON-VESA / Larger Monitor Installation Spacers Options NON-VESA / Larger Monitor Installation Attach monitor using monitor hardware, M-A, M-B, etc…Coloque las cubiertas Install Instale Installer Anbringen Installeer InstallareAttach covers Fixez les cachesEste paso podría requerir de dos personas Continue InstallationThis step may require two people Hiervoor zijn mogelijk twee mensen nodigVesa Monitor Installation 100mm 200mmVesa Monitor Installation Loosen Fastener Remove End Cap StickersRetirez RemoveRetire Entfernen SieM-B M-C M-D M-E M-F M-H Step Connect monitor Adapter to mountForward IR ReceiverIR Receiver Must be placed with the Top of the Head facing Recommended mounting position is on top of TV IR Receiver12 M 49 ft Power Cord Cable Management Remote Control Programming EnglishRemote Control Programming Español AtencionRemote Control Programming Français Étape 1 = RéglageSchritt 4 = Speicher 1 optional Remote Control Programming DeutschVorsicht Schritt 5 = Speicher 2 optionalOpgepast Remote Control Programming NederlandsVoorzichtig Remote Control Programming Italiano AttenzioneRemote Control Programming Русский ПредостережениеLeft Blank Intentionally P43 P44 Dépannage Français Trouble Shooting EnglishResolución de problemas Español Fehlerbehebung Deutsch Problemen opsporen en oplossen- NederlandsDiagnostica/Risoluzione problemi Italiano Omnimount Product Warranty EnglishOmniMount Systems, Inc