GTO R4854 01, 10, 12 installation manual Table of Contents

Page 3

Table of Contents

 

Class Rating

inside cover

Please Read This First

ii

Important Safety Instructions

iii

Technical Specifications

1

Before You Begin

2

Determine Charging Option for Battery: Transformer OR Solar

2

Solar Panel and Gate Activity Chart

2

Check Direction of Gate Swing

3

Prepare the Gate

3

Gate Grounding

3

4000XLS Parts List

4

Tools Needed

5

Materials You may Need for the Installation:

5

Installation Overview

6

Install the Operator

6

Install the Post Bracket Assembly

6

Check Clearance

8

Install Gate Bracket

9

Attach Operator

9

Install Closed Position Stop Plate

10

Mount the Control Box and Receiver

11

Connect Operator Power Cable

12

Connect the Power Input

13

Connect Battery

14

Control Board Settings

15

Set the Closed Position Limit (for Pull-To-Open Applications)

15

Adjust the Stall Force Setting

16

Set Auto Close Time

16

Program Your Personal Transmitter Setting

17

Dip Switch Settings

18

Connecting Accessories

19

Wiring Accessories

20

Connecting Other Auxiliary Devices (Sirens, Lights, etc.)

20

Push-To-Open Installation

21

Setting the Open Position Limit (Push-To-Open Installations)

22

Column Installation

23

Troubleshooting Guide

24

Voltage Readings

25

Repair Service

26

Accessories

27

Image 3
Contents 4000XLS When You Know Multiply By To Find Class RatingFor Your Records Table of Contents 24/7 Troubleshooting Wizard http//support.gtoinc.com Before YOU Begin to Install Your Automatic Gate OperatorPlease Read This First How To Manually Open and Close the Gate Important Safety InstructionsFor The Consumer Important Safety InstructionsAny control device Within gray area Never InstallInstall Warning Signs Entrapment Protection Required Safety Precautions for GatesSecondary Means of Protection Against Entrapment Entrapment Alarm UL 325 30A.1.1ADC Swing Series Control Technical SpecificationsPower DriveZone Watts Determine Charging Option for Battery Transformer or SolarSolar Panel and Gate Activity Chart Before You BeginPrepare the Gate Check Direction of Gate SwingBracket BOX HB4000 4000XLS Parts ListTools Needed Materials You may Need for the InstallationPull-To-Open Gates Gate Opens into the Property Install the OperatorInstallation Overview Install the Post Bracket AssemblyStep Hair pin clip Check ClearanceAttach Operator Install Gate BracketInstall Closed Position Stop Plate Mount the Control Box and Receiver Mount the receiverReceiver cable Never Splice Wires Connect Operator Power CableConnect the Power Input Connect Battery Be certain not to let the exposed wires touch each otherMake sure the exposed wires do not touch each other Control Board Settings Set Closed Position Limit for Pull-To-Open ApplicationsTo Close Set Auto Close Time Adjust the Stall Force Setting24/7 Troubleshooting Wizard http Support.gtoinc.com Program Your Personal Transmitter SettingDIP Switches DIP Switch SettingsInput Connections Connecting AccessoriesWiring Accessories Push-To-Open Installation Information Install the OperatorSwinging gates shall not open into public access areas Set Control Board for Push-To-Open Setting the Open Position Limit Push-To-Open InstallationsColumn Installation Troubleshooting Guide Symptom Diagnosis CheckGeneration 3 Audible Feedback Voltage Readings Generation 3 Visual Feedback800am-700pm Monday-Friday EST Repair ServiceAccessories for 4000XLS Gooseneck Pedestal F100/F110 Residential Wireless Entry Intercom F3100MBCWireless Vehicle Sensor R4500 Wireless Driveway Alarm R4450Push Button Control RB101 Replacement Transformer RB570Photo Beams R4222 Pin Lock FM345Access Systems