Push-To-Open Installation Information
Swinging gates shall not open into public access areas!
A
In a
Install the Operator
Follow directions for installing the |
| A |
4000XLS beginning on page 7. The Push- | Gate In Closed Position | |
|
| |
|
| |
ways: |
|
|
1. In a |
|
|
fully extends to open the gate, and it |
|
|
fully retracts to close the gate. (C) |
|
|
2. You will install the operator while the | Clevis Pin, Bushing, and Hairpin Clip |
|
gate is in the CLOSED POSITION (arm |
| |
|
| |
fully retracted). (A) | Fence Post |
|
3.You must use the
Pivot Bracket [R4KPTO] in the Post Bracket assembly. (B)
4. IMPORTANT: While determining the mounting point for the | 3/8" x | |||
post pivot bracket assembly be sure that the position allows | ||||
for 2” clearance between the gate and the operator in both the | 3/8" Washer | |||
open and closed positions (see diagram below). This clearance | ||||
will give the operator the most efficient leverage point for | Post Bracket | |||
opening and closing the gate and more importantly provides | ||||
| ||||
the least possible pinch area. (C) |
|
| ||
|
| C | 3/8" Washer | |
Clamp |
|
| ||
|
|
| ||
|
|
| 3/8" Lock Nut | |
|
|
| ||
MAX |
|
| Post Pivot Bracket | |
22" |
|
| (R4KPTO) | |
|
|
| *The Troubleshooting Wizard | |
Gate in the Open Position |
| has detailed information on | ||
Pinch Area |
|
| ||
2" minimum | Gate in the Closed Position | Clamp |
| |
|
|
| ||
| Pinch Area |
|
|
2" minimum
GTO 4000XLS Instruction Manual © 01.10.12 21