5. Position the new lamp in the lamp holder.
IMPORTANT: Make sure that the clear surface of the lamp is positioned facing the imaging guides. (NOTE: The imaging guides are not installed in the illustration above.) Replace one lamp at a time to ensure the correct connector is inserted with each lamp; otherwise lamps may not function properly.
6.Push firmly on the end of the lamp to seat the lamp into the socket on the other end.
7.Replace the green lamp connector and push it in firmly so the connector is fully seated.
8.Close the
9.Allow 10 minutes for the lamps to warm up.
10.Calibrate the scanner. See Chapter 3, Operator Control Panel Functions for procedures.
|