S T E P 6 | CABLE #2 |
Remove slotted bolt and nut from the end of the cable. With slotted bolt end of Cable #2 in hand, run cable through Pulleys H and I. Reattach the bolt and nut, and thread into bottom of floating cable anchor (AF1) a minimum of 0.5”. Tighten nut against cable anchor.
I
H
14