S T E P 1 ORANGE BAG
NOTE: During assembly, it is recommended to ensure that all bolts are in place and partially threaded before completely tightening any one bolt. During assembly steps 1 thru 4, do not completely tighten any bolts until completion of Step 4.
• Lay the center floor support (AC1) on the ground, floor pads down. Attach left floor support (AC2) to center floor support by sliding four bolts (M10x70) with four flat washers (10.2x22x2) through the holes, and securing bolts with four more flat washers (10.2x22x2) and four nylon nuts (M10). Repeat for attaching right floor support (AC3).
AC2
AC1
AC3
9