| Frame Assembly | 1 | 42 |
| 42 |
|
|
|
|
|
|
| |||
1. | Before beginning assembly, make sure you |
|
|
|
|
|
|
|
| 42 |
|
|
|
| |
| understand the information in the box on |
|
|
|
|
| |
| page 5. |
|
|
|
|
|
|
|
|
| 1 |
|
|
|
|
| Locate and open the parts bags labeled |
|
|
| 84 |
|
|
|
|
|
|
|
|
| |
| “FRAME ASSEMBLY 1” and “FRAME ASSEM- |
|
| 83 |
|
|
|
| BLY 2.” |
|
|
|
|
| |
| Press four 40mm x 60mm Inner Caps (42) into |
|
|
| 1 |
|
|
| the Right Base (1). |
|
|
|
|
| |
|
|
|
|
|
|
| |
| Insert four M10 x 53mm Carriage Bolts (83) and |
|
| 42 |
|
|
|
| an M10 x 78mm Carriage Bolt (84) up through |
|
|
|
|
|
|
| the Right Base (1). Note: It may be helpful to |
|
|
|
|
|
|
| place tape over the heads of the Carriage |
|
|
| 83 |
|
|
| Bolts to hold them in place. |
|
|
|
|
|
|
2. | Press five 40mm x 60mm Inner Caps (42) into | 2 | 42 |
|
|
|
|
| the Left Base (2). |
|
|
|
|
| |
|
|
|
|
|
|
| |
| Insert four M10 x 53mm Carriage Bolts (83) up |
|
|
|
|
|
|
| through the Left Base (2). Note: It may be help- |
|
|
| 42 |
|
|
| ful to place tape over the heads of the |
|
|
|
|
| |
|
|
|
|
|
|
| |
| Carriage Bolts to hold them in place. |
|
|
| 2 |
|
|
|
|
|
|
|
|
| |
|
|
|
| 83 |
|
|
|
|
|
| 2 | 42 |
|
|
|
|
|
| 83 |
|
|
|
|
|
|
| 42 |
|
|
|
|
3. Attach the Right Base (1) to the Left Base (2) with | 3 |
|
|
|
|
| |
| four M10 x 78mm Bolts (85), four M10 Washers |
|
|
|
|
| |
|
|
|
|
|
|
| |
| (74), and four M10 Nylon Locknuts (75). Do not |
|
| 74 | 85 |
|
|
| tighten the Locknuts yet. |
|
|
|
| ||
|
|
|
|
|
| ||
|
|
|
|
| 74 | 85 |
|
|
|
|
|
|
|
| |
|
|
|
|
|
| 74 | 85 |
|
|
| 1 |
|
|
| 2 |
|
|
| 75 | 75 |
|
|
|
|
| 6 |
|
|
|
|
|