ASSEMBLY STEP 2
HARDWARE BAG 2 CONTENTS
FLAT WASHER (D) | SPRING WASHER (E) | BOLT (F) | BOLT (G) |
20 mm | 18 mm | 20 mm | 35 mm |
Qty: 4 | Qty: 4 | Qty: 4 | Qty: 4 |
FLAT WASHER (H) | SPRING WASHER (I) |
| NUT (J) |
16 mm | 15 mm |
| |
| Qty: 4 | ||
Qty: 4 | Qty: 4 |
| |
|
|
BOLTS (F) |
SPRING WASHERS (E) |
FLAT WASHERS (D) |
INCLINE BRACKET |
NUTS (J) |
SPRING WASHERS (I) |
FLAT WASHERS (H) |
MAIN FRAME |
BOLTS (G) |
GUIDE RAIL SET |
AOpen hardware bag 2.
BAttach the guide rail set to the main frame using 4 bolts (F), 4 spring washers (e) and 4 flat washers (D).
CAttach the guide rail set to the INCLINE BRACKET using 4 bolts
(G), 4 flat washers (H), 4 spring washers (I) and 4 nuts (j).
11