S3.19 Assembly and Maintenance Guide
E. Feed the cable over the lower |
located in the Press Arm assembly. Attach the |
pulley to the Press Arm assembly using |
one |
two zinc flat washers |
one zinc locknut |
Lat Bar Holder
1 - 2" zinc bolt
2 - 2" bolts J 4 - washers 2 - locknuts
F. | Feed the cable over the upper |
| located in the Main Upright. Attach the pulley to the |
| Main Upright using |
| one |
| two |
| one locknut |
G. | Pull the slack out of the Lat Pulley Cable so the ball |
| end of the cable rests against the Lat Bar Holder. |
H. | Feed the threaded end of the cable between the |
| two |
| Pulley. |
J.Let the Double Floating Pulley hang as you continue to feed the cable through the hole in the Upper Frame Crosspiece and over the two
two
two locknuts
K.Feed the cable down through the hole in the Upper Frame Crosspiece and attach the threaded end of the cable into the Selector Stem. Continue turning the screw three to four full turns to secure the threads inside the Selector Stem.
L.Wrench tighten all pulley fasteners.
Important: Do not tighten the Double Floating Pulley fasteners or the jam nut on the threaded end of the cable, at this time.
2 - zinc washers E
1 - zinc locknut
1 - 4" bolt
2 - shoulder spacers F
1 - locknut
H
Pull slack and place the
Gexcess cable on the floor while you assemble the Double Floating Pulley.
K
1
2
3
4
5
6
Step 7. Install Lat Pulley Cable, continued
page 20