39. Wrap the Weight Cable (72) around a 3 1/2” Pulley | 39 |
| 47 | ||
| (24). Attach the 3 1/2” Pulley and a Cable Trap (25) |
| |||
|
|
| |||
|
|
|
| ||
| between the lowest holes in the Adjustable Pulley |
|
| 23 | |
| Plates (23) hanging from the Ab Cable (47) with a |
| 54 | ||
|
|
| |||
| 3/8” x 2” Bolt (54) and a 3/8” Nylon Locknut (50) |
| 25 | 50 | |
| that was removed in step 28. | Be sure that the |
| ||
|
|
| |||
|
|
|
| ||
| Cable Trap is turned to hold the Cable in place. |
|
|
| |
|
|
|
| 24 |
|
|
|
|
|
| 72 |
40. | Remove the preassembled 3/8” x 1 3/4” Bolts (57) | 40 |
|
| |
| from the Small Pulley Plates (22). |
|
|
| |
|
|
|
|
| |
| Wrap the Weight Cable (72) around a 3 1/2” Pulley |
|
|
| |
| (24). Attach the 3 1/2” Pulley between two Small |
|
| 72 | |
| Pulley Plates (22) with a 3/8” x 1 3/4” Bolt (57) and |
| 24 | ||
| a 3/8” Nylon Locknut (50). |
|
|
| |
|
|
|
|
| |
|
|
| 50 |
| 57 |
|
|
|
|
| 22 |
41. Wrap the Weight Cable (72) around a 4 1/2” Pulley | 41 |
|
| ||
| (82). Attach the 4 1/2” Pulley to the bracket on the |
|
| ||
|
|
|
| ||
| Press Top Frame (9) with a 3/8” x 2” Bolt (54) and a |
|
|
| |
| 3/8” Nylon Locknut (50). |
| 54 |
| 72 |
|
|
|
|
| |
|
|
|
| 82 | 50 |
|
|
|
|
| |
|
|
|
|
| Bracket |
|
|
|
| 9 |
|
42. Place a 1/2” Flat Washer (11) on top of the Weight | 42 |
|
| ||
| Tube (17). |
|
|
| |
|
|
|
|
| |
| Thread a 1/2” Plain Nut (100) halfway onto the bolt |
| 72 |
| |
| on the Weight Cable (72). Screw the bolt on the |
|
| ||
|
|
|
| ||
| Weight Cable into the Weight Tube (17) a couple of |
| 100 |
| |
| turns. |
|
| 11 |
|
|
|
|
|
| |
| Tighten the 1/2” Plain Nut (100) down onto the 1/2” |
| 17 |
| |
| Flat Washer (11). |
|
|
| |
|
|
|
|
|
16