American Dryer Corp ML-410 manual Unload Tilted, Load Tilted, If this selection does not operate

Page 12

3.If Air Jet L.E.D. (light emitting diode) is on then check the wiring from the Phase 7 Microprocessor Controller (computer) to the air valve.

4.Faulty air valve.

LOAD/DRY/UNLOAD (Selector Switch) and TILT FUNCTION (Off - On Selector Switch)

As mentioned in the machine summary (refer to page 5), the “LOAD/DRY/UNLOAD” selector switch and “TILT Off - On” selector switch work in conjunction with each other.

UNLOAD or LOAD LEVEL...opens the load doors only

If this selection does not operate;

1.Check that 80 PSI (5.512 bars) of compressed air is supplied to the machine and that the door solenoid is being actuated. The “Door Open” signal is generated by the PLC (Programmable Logic Controller). Refer to the PLC information included in the ladder diagrams and schematics supplied with the machine.

UNLOAD TILTED

This selection causes the front horizontal doors to open. Once the “Door Open” signal is sensed, the PLC enables the “Rear Up” solenoid to tilt the machine. Once the tumbler (basket) section releases the tilt switch, the “JOG” functions become enabled for an operator’s selection.

If the tumbler section does not tilt forward;

1.Verify that a “Door Open” signal is being sensed by the PLC.

2.Check that 80 PSI (5.512 bars) of compressed air is supplied to the machine and that the “Rear Up” solenoid is being actuated by the PLC.

Refer to the PLC signal information included in the ladder diagrams and schematics supplied with the machine.

LOAD TILTED

This selection causes the front horizontal doors to open. Once the “Door Open” signal is sensed, the PLC enables the “Front Up” solenoid to tilt the machine. The “JOG” functions then becomes enabled for an operator’s selection.

If the tumbler section does not tilt towards the rear;

1.Verify that a “Door Open” signal is being sensed by the PLC (Programmable Logic Controller).

2.Check that 80 PSI (5.512 bars) of compressed air is supplied to the machine and that the “Front Up” solenoid is being actuated by the PLC (Programmable Logic Controller).

Refer to the PLC (Programmable Logic Controller) signal information included in the ladder diagrams and schematics supplied with the machine.

8

Image 12
Contents What do YOU do if YOU Smell GAS QUE Faire SI Vous Sentez UNE Odeur DE GAZFor Your Safety Pour Votre SécuritéFor Your Safety Page Table of Contents Cleaning Adjustments Lubrication Air Blower Drive SystemML-410 Reference Guide Page ML-410 Operator CONTROLS/INDICATORS ML-410 Machine Operational SummaryJOG Forward/Reverse Push-Buttons END of CYCLE/AIR JETML-410 Machine Operation Troubleshooting Information END of CYCLE/HEATER Fault IndicatorAIR JET Unload Tilted Load TiltedIf this selection does not operate DRY ONE or Both Burners do not IgniteGAS Pressure Important InformationONE Burner will not Ignite AT the Beginning of a Cycle ONE Burner will not Ignite During a Drying CycleSystem Ladder Diagram Tumbler Temperature and HI-LIMIT InformationFront Level Switch Rear Level Switch Optional Sprinkler Control Signals Section Safety Precautions What to do if YOU Smell GASStandards Specifications and Dimensions Dimensions 410 Tilting Clearance Allow AncesML-410 1 Door/2-Way Tilt ML-410 1 Door/2-Way Tilt MLS-410 1 Door/2-Way Tilt ML-410 1 Door/2-Way Tilt With Inlet Air Adapter Installation Procedures Reassembly of DryerMLG-410 1 Door/Forward Tilt with Sprinkler Important the Flex Hose Must not be Kinked MLG-410 1 Door/Forward Tilt With Sprinkler MLS-410 2 Door/2-Way Tilt Refer to Tilting Piston Reconnection View on MLS-410 2 Door/2-Way Tilt Fresh AIR Supply Requirements Exhaust Requirements Compressed AIR Supply System Page Electrical Information Optional Automatic Piston Operated Load/Unload DoorsOptional Sprinkler Valve Electrical RequirementsElectrical Service Specifications MLG-410 Gas MLS-410 SteamMain Grounding GAS Information Technical Gas Data Gas Specifications Type of GasPiping /Connections Page Steam Information Steam Requirements High PressurePage Steam Damper Air System Connections Air RequirementsAir Connections Air connection to system --- 1/8-inch N.P.T Steam Damper System Operation Steam Damper Air Piston Flow Control Operation Adjustment Water Supply Connection for Optional Sprinkler SystemPreoperational Tests Natural GAS Heat Circuit Operational Test a. Gas ModelsPreparation for OPERATION/START-UP Basket CoatingShut Down Instructions Service PartsReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningMonthly Adjustments LubricationComponent System Descriptions Tumbler Basket Drive SystemSafety Devices Tumbler Basket Manual Reset Hi-Limit Safety ThermostatTumbler Basket AIR Blower Drive SystemSail Switches for Gas Dryers Only Steam Damper Actuator System Optional Sprinkler System Components Optional Sprinkler Circuit ComponentsRefer to the Dryer Nameplate for voltage rating information ML-410 Sprinkler Option Temperature Controller Settings ADC 113128 1- 03/13/00-25