American Dryer Corp ML-410 Machine Operational Summary, ML-410 Operator CONTROLS/INDICATORS

Page 9

INTRODUCTION

ML-410 MACHINE OPERATIONAL SUMMARY

The model ML-410 incorporates one (1) “EMERGENCY STOP” (E-Stop) BUTTON located centrally on the Right Front Control Door. This RED MUSHROOM PUSH-BUTTON is “PUSH TO STOP” the machine and “TURN TO RELEASE” or “PULL TO RELEASE” type control device. This button must be in the released mode to power the machine. The PHASE 7 MICROPROCESSOR CONTROLLER (Computer) display will light when the “EMERGENCY STOP” (E-Stop) BUTTON is in the released mode. To turn “ON” the ML- 410’s control voltage, press the green “ON” push-button located on the Right Front Control Door.

The ML-410 has two (2) electronic controllers:

PHASE 7 MICROPROCESSOR CONTROLLER (Computer) ... for drying material

MODICON PLC (Programmable Logic Controller) ... for loading, unloading auto doors, and burner status monitoring

The PHASE 7 MICROPROCESSOR CONTROLLER (Computer) only response to keyboard (touchpad) commands when the ML-410’s tumbler (basket) section is level with the loading doors and lint drawer/basket door closed. Likewise, the MODICON 1 PLC (Programmable Logic Controller) responses to load or unload selections when the ML-410 is not drying material.

ML-410 OPERATOR CONTROLS/INDICATORS

The Right Front Control Door incorporates the following operator controls/indicators:

“EMERGENCY STOP” (E-Stop) BUTTON (Push To Stop/Turn or Pull To Release)

JOG (Forward/Reverse Push-Buttons)

UNLOAD/DRY/LOAD (Selector Switch)

TILT FUNCTION (Off - On Selector Switch)

CONTROL POWER (Indicator/Control Power On Push-Button)

CONTROL POWER (Off Push-Button)

“EMERGENCY STOP” (E-Stop) BUTTON (Push To Stop/Turn To Release or Pull To Release)

This red mushroom push-button, located in the center of the Right Front Control Door almost directly under the Phase 7 Microprocessor Controller (computer) is a “Push To Stop” and “Turn To Release” type push-button. This button must be in the released mode to power the machine (enable the machine to run).

5

Image 9
Contents QUE Faire SI Vous Sentez UNE Odeur DE GAZ What do YOU do if YOU Smell GASPour Votre Sécurité For Your SafetyFor Your Safety Page Table of Contents Air Blower Drive System Cleaning Adjustments LubricationML-410 Reference Guide Page ML-410 Machine Operational Summary ML-410 Operator CONTROLS/INDICATORSEND of CYCLE/AIR JET JOG Forward/Reverse Push-ButtonsML-410 Machine Operation Troubleshooting Information END of CYCLE/HEATER Fault IndicatorAIR JET Unload Tilted Load TiltedIf this selection does not operate ONE or Both Burners do not Ignite DRYImportant Information GAS PressureONE Burner will not Ignite During a Drying Cycle ONE Burner will not Ignite AT the Beginning of a CycleSystem Ladder Diagram Tumbler Temperature and HI-LIMIT InformationFront Level Switch Rear Level Switch Optional Sprinkler Control Signals Section What to do if YOU Smell GAS Safety PrecautionsStandards Specifications and Dimensions 410 Tilting Clearance Allow Ances DimensionsML-410 1 Door/2-Way Tilt ML-410 1 Door/2-Way Tilt MLS-410 1 Door/2-Way Tilt ML-410 1 Door/2-Way Tilt With Inlet Air Adapter Reassembly of Dryer Installation ProceduresMLG-410 1 Door/Forward Tilt with Sprinkler Important the Flex Hose Must not be Kinked MLG-410 1 Door/Forward Tilt With Sprinkler MLS-410 2 Door/2-Way Tilt Refer to Tilting Piston Reconnection View on MLS-410 2 Door/2-Way Tilt Fresh AIR Supply Requirements Exhaust Requirements Compressed AIR Supply System Page Optional Automatic Piston Operated Load/Unload Doors Electrical InformationOptional Sprinkler Valve Electrical RequirementsMLG-410 Gas MLS-410 Steam Electrical Service SpecificationsMain Grounding GAS Information Type of Gas Technical Gas Data Gas SpecificationsPiping /Connections Page Steam Requirements High Pressure Steam InformationPage Steam Damper Air System Connections Air RequirementsAir Connections Air connection to system --- 1/8-inch N.P.T Steam Damper System Operation Water Supply Connection for Optional Sprinkler System Steam Damper Air Piston Flow Control Operation AdjustmentPreoperational Tests Heat Circuit Operational Test a. Gas Models Natural GASBasket Coating Preparation for OPERATION/START-UPShut Down Instructions Parts ServiceReturning Warranty Parts Returning Warranty CardsPage Cleaning Routine MaintenanceMonthly Lubrication AdjustmentsTumbler Basket Drive System Component System DescriptionsTumbler Basket Manual Reset Hi-Limit Safety Thermostat Safety DevicesTumbler Basket AIR Blower Drive SystemSail Switches for Gas Dryers Only Steam Damper Actuator System Optional Sprinkler Circuit Components Optional Sprinkler System ComponentsRefer to the Dryer Nameplate for voltage rating information ML-410 Sprinkler Option Temperature Controller Settings ADC 113128 1- 03/13/00-25