American Dryer Corp
ML-410
manual
MLG-410 1 Door/Forward Tilt with Sprinkler
Specs
Install
System Ladder Diagram
Warranty
Dimension
Maintenance
Adjustments
Safety Precautions
Safety
Service
Page 28
MLG-410
1 Door/Forward Tilt with Sprinkler
24
Page 27
Page 29
Image 28
Page 27
Page 29
Contents
What do YOU do if YOU Smell GAS
QUE Faire SI Vous Sentez UNE Odeur DE GAZ
For Your Safety
Pour Votre Sécurité
For Your Safety
Page
Table of Contents
Cleaning Adjustments Lubrication
Air Blower Drive System
ML-410 Reference Guide
Page
ML-410 Operator CONTROLS/INDICATORS
ML-410 Machine Operational Summary
JOG Forward/Reverse Push-Buttons
END of CYCLE/AIR JET
END of CYCLE/HEATER Fault Indicator
ML-410 Machine Operation Troubleshooting Information
AIR JET
Load Tilted
Unload Tilted
If this selection does not operate
DRY
ONE or Both Burners do not Ignite
GAS Pressure
Important Information
ONE Burner will not Ignite AT the Beginning of a Cycle
ONE Burner will not Ignite During a Drying Cycle
Tumbler Temperature and HI-LIMIT Information
System Ladder Diagram
Front Level Switch Rear Level Switch
Optional Sprinkler Control Signals
Section
Safety Precautions
What to do if YOU Smell GAS
Standards
Specifications and Dimensions
Dimensions
410 Tilting Clearance Allow Ances
ML-410 1 Door/2-Way Tilt
ML-410 1 Door/2-Way Tilt
MLS-410 1 Door/2-Way Tilt
ML-410 1 Door/2-Way Tilt With Inlet Air Adapter
Installation Procedures
Reassembly of Dryer
MLG-410 1 Door/Forward Tilt with Sprinkler
Important the Flex Hose Must not be Kinked
MLG-410 1 Door/Forward Tilt With Sprinkler
MLS-410 2 Door/2-Way Tilt
Refer to Tilting Piston Reconnection View on
MLS-410 2 Door/2-Way Tilt
Fresh AIR Supply Requirements
Exhaust Requirements
Compressed AIR Supply System
Page
Electrical Information
Optional Automatic Piston Operated Load/Unload Doors
Optional Sprinkler Valve
Electrical Requirements
Electrical Service Specifications
MLG-410 Gas MLS-410 Steam
Main Grounding
GAS Information
Technical Gas Data Gas Specifications
Type of Gas
Piping /Connections
Page
Steam Information
Steam Requirements High Pressure
Page
Air Requirements
Steam Damper Air System Connections
Air Connections Air connection to system --- 1/8-inch N.P.T
Steam Damper System Operation
Steam Damper Air Piston Flow Control Operation Adjustment
Water Supply Connection for Optional Sprinkler System
Preoperational Tests
Natural GAS
Heat Circuit Operational Test a. Gas Models
Preparation for OPERATION/START-UP
Basket Coating
Shut Down Instructions
Service
Parts
Returning Warranty Cards
Returning Warranty Parts
Page
Routine Maintenance
Cleaning
Monthly
Adjustments
Lubrication
Component System Descriptions
Tumbler Basket Drive System
Safety Devices
Tumbler Basket Manual Reset Hi-Limit Safety Thermostat
Tumbler Basket
AIR Blower Drive System
Sail Switches for Gas Dryers Only
Steam Damper Actuator System
Optional Sprinkler System Components
Optional Sprinkler Circuit Components
Refer to the Dryer Nameplate for voltage rating information
ML-410 Sprinkler Option Temperature Controller Settings
ADC 113128 1- 03/13/00-25
Related pages
How do I set the timer on my
Mr. Coffee FTX25
?(/path/to/page)
Top
Page
Image
Contents