OPTIONAL SPRINKLER CONTROL SIGNALS

4.Left Hand Control Cabinet

The thermal magnetic overload and reversing contactor for the tumbler (basket) motor!

The OPTIONAL SPRINKLER CIRCUIT main control panel will be located in the left front electrical enclosure. If a SPRINKLER OPTION is included with the ML-410, this panel will include an “AUTOMATIC ‘EMERGENCY STOP’ (E-Stop)”feature. This feature requires the Sprinkler Circuit be functional for the dryer to be powered.

NOTE: There will be a dedicated electrical connection in the Right Electrical Junction Box for the Sprinkler Circuit.

13

Image 17
Contents QUE Faire SI Vous Sentez UNE Odeur DE GAZ What do YOU do if YOU Smell GASPour Votre Sécurité For Your SafetyFor Your Safety Page Table of Contents Air Blower Drive System Cleaning Adjustments LubricationML-410 Reference Guide Page ML-410 Machine Operational Summary ML-410 Operator CONTROLS/INDICATORSEND of CYCLE/AIR JET JOG Forward/Reverse Push-ButtonsAIR JET ML-410 Machine Operation Troubleshooting InformationEND of CYCLE/HEATER Fault Indicator If this selection does not operate Unload TiltedLoad Tilted ONE or Both Burners do not Ignite DRYImportant Information GAS PressureONE Burner will not Ignite During a Drying Cycle ONE Burner will not Ignite AT the Beginning of a CycleFront Level Switch Rear Level Switch System Ladder DiagramTumbler Temperature and HI-LIMIT Information Optional Sprinkler Control Signals Section What to do if YOU Smell GAS Safety PrecautionsStandards Specifications and Dimensions 410 Tilting Clearance Allow Ances DimensionsML-410 1 Door/2-Way Tilt ML-410 1 Door/2-Way Tilt MLS-410 1 Door/2-Way Tilt ML-410 1 Door/2-Way Tilt With Inlet Air Adapter Reassembly of Dryer Installation ProceduresMLG-410 1 Door/Forward Tilt with Sprinkler Important the Flex Hose Must not be Kinked MLG-410 1 Door/Forward Tilt With Sprinkler MLS-410 2 Door/2-Way Tilt Refer to Tilting Piston Reconnection View on MLS-410 2 Door/2-Way Tilt Fresh AIR Supply Requirements Exhaust Requirements Compressed AIR Supply System Page Optional Automatic Piston Operated Load/Unload Doors Electrical InformationOptional Sprinkler Valve Electrical RequirementsMLG-410 Gas MLS-410 Steam Electrical Service SpecificationsMain Grounding GAS Information Type of Gas Technical Gas Data Gas SpecificationsPiping /Connections Page Steam Requirements High Pressure Steam InformationPage Air Connections Air connection to system --- 1/8-inch N.P.T Steam Damper Air System ConnectionsAir Requirements Steam Damper System Operation Water Supply Connection for Optional Sprinkler System Steam Damper Air Piston Flow Control Operation AdjustmentPreoperational Tests Heat Circuit Operational Test a. Gas Models Natural GASBasket Coating Preparation for OPERATION/START-UPShut Down Instructions Parts ServiceReturning Warranty Parts Returning Warranty CardsPage Cleaning Routine MaintenanceMonthly Lubrication AdjustmentsTumbler Basket Drive System Component System DescriptionsTumbler Basket Manual Reset Hi-Limit Safety Thermostat Safety DevicesTumbler Basket AIR Blower Drive SystemSail Switches for Gas Dryers Only Steam Damper Actuator System Optional Sprinkler Circuit Components Optional Sprinkler System ComponentsRefer to the Dryer Nameplate for voltage rating information ML-410 Sprinkler Option Temperature Controller Settings ADC 113128 1- 03/13/00-25