American Dryer Corp ML-410 manual Installation Procedures, Reassembly of Dryer

Page 27

SECTION III

INSTALLATION PROCEDURES

Installation in a proper location should be performed by competent technicians in accordance with local and state codes. In the absence of these codes, the installation must conform to applicable American National Standards: National Fuel Gas Code ANSI.Z223.1-LATEST EDITION and/or National Electrical Code ANSI/ NFPA NO. 70-LATEST EDITION, or in Canada, the Canadian Electrical Codes Parts 1 & 2 CSA C22.1-1990 or

LATEST EDITION.

A. REASSEMBLY OF DRYER

IMPORTANT: Always keep the tumbler (basket) section in an upright position when moving and/or transporting.

The ML-410 dryer is shipped in two (2) pieces with the tumbler (basket) section separate from the base section. The tumbler (basket) section will have to be lifted/hoisted onto the base section. Use cables through the eye bolts on top of the tumbler (basket) section, or use a forklift for the lifting process.

The ML-410 tilting dryer is made with many loading and unloading options. Please refer to the reassembly instructions on the following pages for your particular style of dryer.

If a steam dryer is shipped in two (2) pieces, the steam coil may have been removed from the top of the tumbler (basket) section and shipped with the base section. If this is the case, carefully lift the steam coil on to the top of the tumbler (basket) section with the steam pipe connections facing towards the right side of the dryer and bolt the coil to the top of the dryer with the 1/4” hardware supplied. There are three (3) panels that cover the front, right side, and rear of the steam coil. Fasten these into position also. Reconnect the steam pipe and condensate pipe unions to the coil. These pipes run down to the flex hoses in the base section.

23

Image 27
Contents QUE Faire SI Vous Sentez UNE Odeur DE GAZ What do YOU do if YOU Smell GASPour Votre Sécurité For Your SafetyFor Your Safety Page Table of Contents Air Blower Drive System Cleaning Adjustments LubricationML-410 Reference Guide Page ML-410 Machine Operational Summary ML-410 Operator CONTROLS/INDICATORSEND of CYCLE/AIR JET JOG Forward/Reverse Push-ButtonsML-410 Machine Operation Troubleshooting Information END of CYCLE/HEATER Fault IndicatorAIR JET Unload Tilted Load TiltedIf this selection does not operate ONE or Both Burners do not Ignite DRYImportant Information GAS PressureONE Burner will not Ignite During a Drying Cycle ONE Burner will not Ignite AT the Beginning of a CycleSystem Ladder Diagram Tumbler Temperature and HI-LIMIT InformationFront Level Switch Rear Level Switch Optional Sprinkler Control Signals Section What to do if YOU Smell GAS Safety PrecautionsStandards Specifications and Dimensions 410 Tilting Clearance Allow Ances DimensionsML-410 1 Door/2-Way Tilt ML-410 1 Door/2-Way Tilt MLS-410 1 Door/2-Way Tilt ML-410 1 Door/2-Way Tilt With Inlet Air Adapter Reassembly of Dryer Installation ProceduresMLG-410 1 Door/Forward Tilt with Sprinkler Important the Flex Hose Must not be Kinked MLG-410 1 Door/Forward Tilt With Sprinkler MLS-410 2 Door/2-Way Tilt Refer to Tilting Piston Reconnection View on MLS-410 2 Door/2-Way Tilt Fresh AIR Supply Requirements Exhaust Requirements Compressed AIR Supply System Page Electrical Requirements Electrical InformationOptional Automatic Piston Operated Load/Unload Doors Optional Sprinkler ValveMLG-410 Gas MLS-410 Steam Electrical Service SpecificationsMain Grounding GAS Information Type of Gas Technical Gas Data Gas SpecificationsPiping /Connections Page Steam Requirements High Pressure Steam InformationPage Steam Damper Air System Connections Air RequirementsAir Connections Air connection to system --- 1/8-inch N.P.T Steam Damper System Operation Water Supply Connection for Optional Sprinkler System Steam Damper Air Piston Flow Control Operation AdjustmentPreoperational Tests Heat Circuit Operational Test a. Gas Models Natural GASBasket Coating Preparation for OPERATION/START-UPShut Down Instructions Parts ServiceReturning Warranty Parts Returning Warranty CardsPage Cleaning Routine MaintenanceMonthly Lubrication AdjustmentsTumbler Basket Drive System Component System DescriptionsAIR Blower Drive System Safety DevicesTumbler Basket Manual Reset Hi-Limit Safety Thermostat Tumbler BasketSail Switches for Gas Dryers Only Steam Damper Actuator System Optional Sprinkler Circuit Components Optional Sprinkler System ComponentsRefer to the Dryer Nameplate for voltage rating information ML-410 Sprinkler Option Temperature Controller Settings ADC 113128 1- 03/13/00-25