SYSTEM LADDER DIAGRAM

The SYSTEM LADDER DIAGRAM is an overview on the electrical connections of the ML-410. This diagram is for signal flow information and is a tool to direct an individual in the correct direction for troubleshooting this machine.

The ML-410 system is divided into a number of “electrical” sections which are as follows:

1.Right Front Control Panel

The RIGHT FRONT CONTROL PANEL is located in the Right Front Control Cabinet of the ML-410. This panel is the heart of the drying system, where ALL control signals interface to or from this panel. The signals that interface to this panel are too many to list here, however, they are ALL identified on TB1 of its’ schematic diagram.

2.Right Base Electrical Enclosure

The RIGHT BASE ELECTRICAL ENCLOSURE is located towards the front of the right base section. An industrial multi-pin connector is used to connect the base section control signals to the tumbler (basket) section’s main control panel. This electrical enclosure is labeled CAUTION, HIGH VOLTAGE IS PRESENT IN THIS ENCLOSURE and incorporates the following electrical devices:

The MAIN ELECTRICAL POWER to the machine

The ELECTRICAL CONNECTION for the “OPTIONAL” SPRINKLER CIRCUIT POWER

The THERMAL/MAGNETIC OVERLOAD and CONTACTOR for the BLOWER MOTOR

3.Right Base Interface Junction Box

The RIGHT BASE INTERFACE JUNCTION BOX is located towards the rear of the right base section and is used as a central location to interface the base section electrical components to the TILTING tumbler (basket) section. An industrial multi-pin connector is used to connect the base section control signals to the tumbler (basket) section’s main control panel. The control signals incorporated in the Right Base Interface Junction Box are:

SOLENOID CONTROL

Front Up/Front Down

Rear Up/Rear Down

Open Front Door

Supply Air Enable

Air Jet

LINT DRAWER/STATUS

TUMBLER TEMPERATURE and HI-LIMIT INFORMATION

TUMBLER LEVEL SENSE

Front Level Switch

Rear Level Switch

12

Image 16
Contents What do YOU do if YOU Smell GAS QUE Faire SI Vous Sentez UNE Odeur DE GAZFor Your Safety Pour Votre SécuritéFor Your Safety Page Table of Contents Cleaning Adjustments Lubrication Air Blower Drive SystemML-410 Reference Guide Page ML-410 Operator CONTROLS/INDICATORS ML-410 Machine Operational SummaryJOG Forward/Reverse Push-Buttons END of CYCLE/AIR JETEND of CYCLE/HEATER Fault Indicator ML-410 Machine Operation Troubleshooting InformationAIR JET Load Tilted Unload TiltedIf this selection does not operate DRY ONE or Both Burners do not IgniteGAS Pressure Important InformationONE Burner will not Ignite AT the Beginning of a Cycle ONE Burner will not Ignite During a Drying CycleTumbler Temperature and HI-LIMIT Information System Ladder DiagramFront Level Switch Rear Level Switch Optional Sprinkler Control Signals Section Safety Precautions What to do if YOU Smell GASStandards Specifications and Dimensions Dimensions 410 Tilting Clearance Allow AncesML-410 1 Door/2-Way Tilt ML-410 1 Door/2-Way Tilt MLS-410 1 Door/2-Way Tilt ML-410 1 Door/2-Way Tilt With Inlet Air Adapter Installation Procedures Reassembly of DryerMLG-410 1 Door/Forward Tilt with Sprinkler Important the Flex Hose Must not be Kinked MLG-410 1 Door/Forward Tilt With Sprinkler MLS-410 2 Door/2-Way Tilt Refer to Tilting Piston Reconnection View on MLS-410 2 Door/2-Way Tilt Fresh AIR Supply Requirements Exhaust Requirements Compressed AIR Supply System Page Electrical Information Optional Automatic Piston Operated Load/Unload DoorsOptional Sprinkler Valve Electrical RequirementsElectrical Service Specifications MLG-410 Gas MLS-410 SteamMain Grounding GAS Information Technical Gas Data Gas Specifications Type of GasPiping /Connections Page Steam Information Steam Requirements High PressurePage Air Requirements Steam Damper Air System ConnectionsAir Connections Air connection to system --- 1/8-inch N.P.T Steam Damper System Operation Steam Damper Air Piston Flow Control Operation Adjustment Water Supply Connection for Optional Sprinkler SystemPreoperational Tests Natural GAS Heat Circuit Operational Test a. Gas ModelsPreparation for OPERATION/START-UP Basket CoatingShut Down Instructions Service PartsReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningMonthly Adjustments LubricationComponent System Descriptions Tumbler Basket Drive SystemSafety Devices Tumbler Basket Manual Reset Hi-Limit Safety ThermostatTumbler Basket AIR Blower Drive SystemSail Switches for Gas Dryers Only Steam Damper Actuator System Optional Sprinkler System Components Optional Sprinkler Circuit ComponentsRefer to the Dryer Nameplate for voltage rating information ML-410 Sprinkler Option Temperature Controller Settings ADC 113128 1- 03/13/00-25