Airstream
PNEG-343
service manual
Ryer Operation
Series Wiring Diagrams
Setting the OUT Grain Timer
Safety Alert Symbol
Series Wiring to Control BOX
Warranty
Problem Possible Cause
Lube Procedures
Safety Precautions
Safety
Control Power Switch
Page 1
A
I R S T R E A M
G
R A I N
C
O N D I T I O N I N G
S
Y S T E M S
D
1 9 9 4
RYER OPERATION
A N D S E R V I C E M A N U A L
PNEG-343
1300 SERIES
THREE FAN PORTABLE
DRYER MODELS
1
Page 1
Page 2
Image 1
Page 1
Page 2
Contents
Ryer Operation
Page
Table of Contents
Series Dryer Operation and Service
Warranty
Safety Alert Symbol
Safety First
Safety Alert Decals
Careful Operator Is the Best Insurance Against AN Accident
Safety Alert Decals
Keep the Dryer Clean Do not Allow Fine
Safety Precautions
Dryer Control Panel
Moisture Control Switch
Moisture Control Thermostat
Information regarding dryer operation
Drying Mode Switch
Control Power Switch
Load Auger Switch
FAN Switches
Dryer Power Stop Switch
Dryer Power Start Switch
Setting the OUT Grain Timer
Setting the DRY, Cool Batch and Unload Timers
Electronic Monitoring Control System
Turning on Electronic Monitoring Control System
Dryer Safety Circuit
Setting the Load Unload Delays
Utilizing Bushel Counter
Safety Circuit Shutdown Messages
PRE Season Inspection
Dryer PRE Start Checks
Load Auger
TWO Speed Operation
ONE Speed Operation
Metering Roll Operation
Burner Test Fire
Burner Safety
Dryer Shutdown
Staged Batch Check
Emergency
Turn the control power switch to on
Continuous Flow and Continuous Batch Start UP Procedure
Dryer Start UP
Continuous Flow Operation
Dryer Start UP & Operation
Series Continuous Flow Metering Roll Settings
Full Heat
Dry & Cool
Continuous Flow Metering Roll Settings
Staged Batch Operation
Matically shut down during the cooling and unloading cycles
Staged Batch FAN & Heater Switch Settings
Full Heat Dry & Cool
Series Batch Timer Settings
Series Staged Batch Timer Settings
Series Service Guide
Seasonal Inspection and Service
Service
Lube Procedures
Insulation Class Consistency Type Grease Frame Type
Suggested Lubricants
Threaded Bushing Holes
FAN Propellor Removal and Installation
Clearance Holes
FAN Motor Removal and Installation
Heater Parts Removal and Installation
Main Controls
Metering Roll Servicing
HOW to Clear a Jammed Metering Roll
HOW to Determine a Metering Roll Problem
Service Tool
Series Wiring Diagrams
INPUT/OUTPUT Board Terminal Identification
Series Wiring to Control BOX
Series Control Wiring
Series Safety Wiring Diagram
Series Front Panel Internal Wiring
Series Front Panel External Wiring
Dryer FAN can Control Wiring
Series 220 Volt Single Phase Control Wiring
Series 220 Volt 3 Phase Power Wiring
Series 440 Volt 3 Phase Power Wiring
Problem Possible Cause
Trouble Analysis Procedure
Display shows Burner 1, 2 or 3 Warning Flame
May not be turning. The air switch may need adjustment
Problem Possible Cause
Trouble Analysis Procedure
Quick Reference Guide
Press the enter button when desired setting is reached
Change the marquee on the LCD dis- play
Page
Related pages
10.5 Troubleshooting dynamic problems for Teledyne 300
Specifications for Shure 57A
Responding to Error Messages for Dell 2900
Surround Mode Chart for Harman-Kardon AVR 500
HOW to USE a Portable Band SAW for Porter-Cable 7724
Equipment Installation for OTC Wireless TRIMAR
Appendix B Diagrams and Parts Lists for Christie Digital Systems P35GPS-MT
TV Brand Code List for Samsung HT-TZ222
Recall Feature for Panasonic KX-TCD505E
Setting Options for Q-Logic 2300
Where is Heat Controller Inc. located?
Get location details
Top
Page
Image
Contents