Airstream PNEG-343 TWO Speed Operation, Load Auger, ONE Speed Operation, Metering Roll Operation

Page 15

DRYER PRE START CHECKS

The metering roll access area.

iary is wired to the dryer, it should start

and rotate in the proper direction.

MOISTURE CONTROL

THERMOSTAT

To check the moisture control ther- mostat leave the unloading switch on one speed, and slowly turn down the moisture control thermostat. As the setting is decreased, the indica- tor light should come on and the me- tering rolls should stop operating. The bottom auger will stop after the 30 second clean out delay, provid- ing that the dryer is still being held by the moisture control thermostat. Rotate the moisture control thermo- stat up to its maximum setting. The light should go off, and the metering rolls should restart along with the bottom auger if it has stopped.

TWO SPEED OPERATION

To check two speed operation move the switch to the two speed position, set low speed on 200 and high

LOAD AUGER

With the grain supply shut off, quickly bump the load auger switch to manual, and see if the load auger rotates clockwise as viewed from the drive end, or counterclockwise if the dryer is a front load model. If the wet grain supply auxiliary is wired to the dryer it should also rotate in the cor- rect direction at this time. Turn the load auger switch to the auto posi- tion. The top auger and wet grain supply auxiliary should run for one minute, and then the dryer will shut- down leaving the safety shutdown message (out of grain warning) dis-

played. Press the dryer power stop

button to reset the panel, then press

the start button.

ONE SPEED OPERATION

To check one speed operation place the unload switch in the one speed setting. Turn up the high speed metering roll dial until the metering rolls start rotating. The bottom auger should rotate coun- terclockwise as viewed from the drive end. The metering roll drive motor should rotate clockwise as viewed from the drive end of the gear box. If the dry grain take away auxil-

speed on 600. Slowly turn the ther- mostat until the moisture control switch light comes on. The meter- ing roll speed is now controlled by the low speed dial. Turning the ther- mostat the other way until the light goes out leaves the metering rolls con- trolled by the high speed dial.

METERING ROLL

OPERATION

To check the metering roll operation turn either the low speed or high speed knob clockwise, and the metering roll speed should increase. Turning ei- ther knob counterclockwise will de-

15

Image 15
Contents Ryer Operation Page Table of Contents Series Dryer Operation and ServiceWarranty Careful Operator Is the Best Insurance Against AN Accident Safety FirstSafety Alert Symbol Safety Alert DecalsSafety Alert Decals Keep the Dryer Clean Do not Allow Fine Safety PrecautionsInformation regarding dryer operation Moisture Control SwitchDryer Control Panel Moisture Control ThermostatFAN Switches Control Power SwitchDrying Mode Switch Load Auger SwitchDryer Power Stop Switch Dryer Power Start SwitchTurning on Electronic Monitoring Control System Setting the DRY, Cool Batch and Unload TimersSetting the OUT Grain Timer Electronic Monitoring Control System Setting the Load Unload Delays Dryer Safety Circuit Utilizing Bushel Counter Safety Circuit Shutdown Messages PRE Season Inspection Dryer PRE Start ChecksMetering Roll Operation TWO Speed OperationLoad Auger ONE Speed OperationBurner Test Fire Burner SafetyStaged Batch Check Dryer ShutdownEmergency Continuous Flow Operation Continuous Flow and Continuous Batch Start UP ProcedureTurn the control power switch to on Dryer Start UPSeries Continuous Flow Metering Roll Settings Dryer Start UP & OperationFull Heat Dry & Cool Continuous Flow Metering Roll SettingsStaged Batch Operation Matically shut down during the cooling and unloading cycles Staged Batch FAN & Heater Switch SettingsFull Heat Dry & Cool Series Batch Timer SettingsSeries Staged Batch Timer Settings Series Service Guide Service Seasonal Inspection and ServiceLube Procedures Insulation Class Consistency Type Grease Frame Type Suggested LubricantsFAN Propellor Removal and Installation Threaded Bushing HolesClearance Holes FAN Motor Removal and Installation Heater Parts Removal and Installation Main Controls Metering Roll ServicingHOW to Determine a Metering Roll Problem HOW to Clear a Jammed Metering RollService Tool Series Wiring Diagrams INPUT/OUTPUT Board Terminal Identification Series Wiring to Control BOX Series Control Wiring Series Safety Wiring Diagram Series Front Panel Internal Wiring Series Front Panel External Wiring Dryer FAN can Control Wiring Series 220 Volt Single Phase Control Wiring Series 220 Volt 3 Phase Power Wiring Series 440 Volt 3 Phase Power Wiring Problem Possible Cause Trouble Analysis ProcedureDisplay shows Burner 1, 2 or 3 Warning Flame May not be turning. The air switch may need adjustment Problem Possible Cause Trouble Analysis Procedure Press the enter button when desired setting is reached Quick Reference GuideChange the marquee on the LCD dis- play Page