Airstream PNEG-343 Dryer Start UP & Operation, Series Continuous Flow Metering Roll Settings

Page 19

DRYER START UP & OPERATION

1300 SERIES CONTINUOUS FLOW METERING ROLL SETTINGS

 

 

 

 

Full Heat

 

 

 

 

 

 

 

Initial

Moisture

Approx.

 

2 Speed

2 Speed

Moisture

Removed

Dry Time

1 Speed

Low

High

17%

2 pts.

16 min.

625

317

875

18%

3 pts.

21 min.

476

270

775

19%

4 pts.

26 min

385

241

675

20%

5 pts.

31.5 min.

317

213

575

21%

6 pts.

37 min.

270

196

476

22%

7 pts.

41.5 min.

241

185

385

23%

8 pts.

47 min.

213

172

317

24%

9 pts.

51 min.

196

161

270

25%

10 pts.

54 min.

185

150

241

26%

11 pts.

58 min.

172

140

213

27%

12 pts.

62 min.

161

132

196

28%

13 pts.

66.5 min.

150

123

185

29%

14 pts.

71.5 min.

140

116

172

30%

15 pts.

76 min.

132

110

161

31%

16 pts.

81 min.

123

104

150

32%

17 pts.

86 min.

116

100

140

33%

18 pts.

91 min.

110

096

132

34%

19 pts.

96 min.

104

087

123

35%

20 pts.

100 min.

100

082

116

These are approximate starting points.

19

Image 19
Contents Ryer Operation Page Table of Contents Series Dryer Operation and ServiceWarranty Careful Operator Is the Best Insurance Against AN Accident Safety FirstSafety Alert Symbol Safety Alert DecalsSafety Alert Decals Keep the Dryer Clean Do not Allow Fine Safety PrecautionsInformation regarding dryer operation Moisture Control SwitchDryer Control Panel Moisture Control ThermostatFAN Switches Control Power SwitchDrying Mode Switch Load Auger SwitchDryer Power Stop Switch Dryer Power Start SwitchTurning on Electronic Monitoring Control System Setting the DRY, Cool Batch and Unload TimersSetting the OUT Grain Timer Electronic Monitoring Control SystemDryer Safety Circuit Setting the Load Unload DelaysUtilizing Bushel Counter Safety Circuit Shutdown Messages PRE Season Inspection Dryer PRE Start ChecksMetering Roll Operation TWO Speed OperationLoad Auger ONE Speed OperationBurner Test Fire Burner SafetyDryer Shutdown Staged Batch CheckEmergency Continuous Flow Operation Continuous Flow and Continuous Batch Start UP ProcedureTurn the control power switch to on Dryer Start UPDryer Start UP & Operation Series Continuous Flow Metering Roll SettingsFull Heat Dry & Cool Continuous Flow Metering Roll SettingsStaged Batch Operation Matically shut down during the cooling and unloading cycles Staged Batch FAN & Heater Switch SettingsFull Heat Dry & Cool Series Batch Timer SettingsSeries Staged Batch Timer Settings Series Service Guide Seasonal Inspection and Service ServiceLube Procedures Insulation Class Consistency Type Grease Frame Type Suggested LubricantsThreaded Bushing Holes FAN Propellor Removal and InstallationClearance Holes FAN Motor Removal and Installation Heater Parts Removal and Installation Main Controls Metering Roll ServicingHOW to Clear a Jammed Metering Roll HOW to Determine a Metering Roll ProblemService Tool Series Wiring Diagrams INPUT/OUTPUT Board Terminal Identification Series Wiring to Control BOX Series Control Wiring Series Safety Wiring Diagram Series Front Panel Internal Wiring Series Front Panel External Wiring Dryer FAN can Control Wiring Series 220 Volt Single Phase Control Wiring Series 220 Volt 3 Phase Power Wiring Series 440 Volt 3 Phase Power Wiring Problem Possible Cause Trouble Analysis ProcedureDisplay shows Burner 1, 2 or 3 Warning Flame May not be turning. The air switch may need adjustment Problem Possible Cause Trouble Analysis Procedure Quick Reference Guide Press the enter button when desired setting is reachedChange the marquee on the LCD dis- play Page