DRYER PRE START CHECKS

PRE SEASON INSPECTION

Before the dryer is filled, thoroughly inspect the unit and check the op- eration of the dryer as follows.

INSPECT THE METERING

ROLLS

Open all metering roll access doors and inspect each compartment for any bolts, nuts or other foreign ma- terial, that may cause possible jam- ming of the metering rolls.

BEFORE ATTEMPTING TO OPERATE THE DRYER MAKE SURE ALL SAFETY SHIELDS ARE IN PLACE, ALL BOTTOM

The Maxon safety shut off valve.

CLEANOUT AND REAR

ACCESS DOORS ARE CLOSED AND ALL PERSONNEL ARE CLEAR OF THE DRYER

SET CONTROL SWITCHES

Moisture Control Switch-ON Moisture Control Thermostat-MAXI-

MUM TEMPERATURE

Load Switch-OFF

Unload Switch-OFF

Fan Switches-OFF

Burner Switches-OFF

Out of Grain Timer-8 MINUTE

Load Delay-30 SECONDS

Unload Delay-30 SECONDS

Metering Roll Speed-LOW AND

HIGH SPEED SETTINGS PUT ON ZERO

Dry Timer-60 MINUTE Cool timer-20 MINUTE Unload timer-10 SECONDS

Mode Switch-CONTINUOUS FLOW

ELECTRICAL POWER

Turn on the electrical power supply to the dryer; set all circuit breakers to on, including the safety discon- nect handle mounted on front of the dryer power panel.

CONTROL POWER

SWITCH

Turn the control power switch to on. The switch will light up. A copyright message, model number, total run- ning time in hours and minutes, cur- rent date and time will appear. At this point the controller will lock out all other dryer functions. Once the date and time appear, press reset and the dryer will perform its safety circuit check. If a fault is found, the cause will be displayed on the LCD. If all are found safe, the controller will sup- ply power to the electronic fuel shut- off valve, if so equipped, and the dry- ing mode switch will light up, indicat- ing that the dryer is ready to be started.

POWER START BUTTON

Push the dryer start button, and all the selector switches on the control panel will be activated.

FUEL CHECK

If using LP gas, make sure the tank has plenty of fuel and that the tank does not have a regulator mounted to it. If using natural gas, make sure an adequate supply is available.

If using LP gas, slowly open the main fuel supply valve at the tank. If using natural gas, turn on the valve along the supply line. Then, open the electronic shut off valve (Maxon valve), if so equipped, or open the manual shut off valve on the dryer to allow fuel flow to the dryer. In- spect all gas lines and connections for possible leaks.

Any gas leaks must be fixed immediately!

14

Image 14
Contents Ryer Operation Page Series Dryer Operation and Service Table of ContentsWarranty Safety Alert Decals Safety FirstSafety Alert Symbol Careful Operator Is the Best Insurance Against AN AccidentSafety Alert Decals Safety Precautions Keep the Dryer Clean Do not Allow FineMoisture Control Thermostat Moisture Control SwitchDryer Control Panel Information regarding dryer operationLoad Auger Switch Control Power SwitchDrying Mode Switch FAN SwitchesDryer Power Start Switch Dryer Power Stop SwitchElectronic Monitoring Control System Setting the DRY, Cool Batch and Unload TimersSetting the OUT Grain Timer Turning on Electronic Monitoring Control SystemUtilizing Bushel Counter Setting the Load Unload DelaysDryer Safety Circuit Safety Circuit Shutdown Messages Dryer PRE Start Checks PRE Season InspectionONE Speed Operation TWO Speed OperationLoad Auger Metering Roll OperationBurner Safety Burner Test FireEmergency Staged Batch CheckDryer Shutdown Dryer Start UP Continuous Flow and Continuous Batch Start UP ProcedureTurn the control power switch to on Continuous Flow OperationFull Heat Series Continuous Flow Metering Roll SettingsDryer Start UP & Operation Continuous Flow Metering Roll Settings Dry & CoolStaged Batch Operation Staged Batch FAN & Heater Switch Settings Matically shut down during the cooling and unloading cyclesSeries Batch Timer Settings Full Heat Dry & CoolSeries Staged Batch Timer Settings Series Service Guide Lube Procedures ServiceSeasonal Inspection and Service Suggested Lubricants Insulation Class Consistency Type Grease Frame TypeClearance Holes FAN Propellor Removal and InstallationThreaded Bushing Holes FAN Motor Removal and Installation Heater Parts Removal and Installation Metering Roll Servicing Main ControlsService Tool HOW to Determine a Metering Roll ProblemHOW to Clear a Jammed Metering Roll Series Wiring Diagrams INPUT/OUTPUT Board Terminal Identification Series Wiring to Control BOX Series Control Wiring Series Safety Wiring Diagram Series Front Panel Internal Wiring Series Front Panel External Wiring Dryer FAN can Control Wiring Series 220 Volt Single Phase Control Wiring Series 220 Volt 3 Phase Power Wiring Series 440 Volt 3 Phase Power Wiring Trouble Analysis Procedure Problem Possible CauseDisplay shows Burner 1, 2 or 3 Warning Flame May not be turning. The air switch may need adjustment Problem Possible Cause Trouble Analysis Procedure Change the marquee on the LCD dis- play Press the enter button when desired setting is reachedQuick Reference Guide Page