Airstream PNEG-343 service manual Continuous Flow Metering Roll Settings, Dry & Cool

Page 20

DRYER START UP & OPERATION

CONTINUOUS FLOW METERING ROLL SETTINGS*

 

 

 

 

Dry & Cool

 

 

 

 

 

 

 

Initial

Moisture

Approx.

 

2 Speed

2 Speed

Moisture

Removed

Dry Time

1 Speed

Low

High

17%

2 pts.

18 min.

363

187

650

18%

3 pts.

24 min.

272

163

550

19%

4 pts.

30 min

218

145

450

20%

5 pts.

35 min.

187

131

363

21%

6 pts.

40 min.

163

119

272

22%

7 pts.

45 min.

145

109

218

23%

8 pts.

50 min.

131

101

187

24%

9 pts.

55 min.

119

093

163

25%

10 pts.

60 min.

109

087

145

26%

11 pts.

65 min.

101

082

131

27%

12 pts.

70 min.

093

077

119

28%

13 pts.

75 min.

087

073

109

29%

14 pts.

80 min.

082

069

101

30%

15 pts.

85 min.

077

065

093

31%

16 pts.

90 min.

073

061

087

32%

17 pts.

95 min.

069

057

082

33%

18 pts.

100 min.

065

053

077

34%

19 pts.

105 min.

062

049

073

35%

20 pts.

110 min.

059

045

069

These are approximate starting points.

20

Image 20
Contents Ryer Operation Page Series Dryer Operation and Service Table of ContentsWarranty Safety First Safety Alert SymbolSafety Alert Decals Careful Operator Is the Best Insurance Against AN AccidentSafety Alert Decals Safety Precautions Keep the Dryer Clean Do not Allow FineMoisture Control Switch Dryer Control PanelMoisture Control Thermostat Information regarding dryer operationControl Power Switch Drying Mode SwitchLoad Auger Switch FAN SwitchesDryer Power Start Switch Dryer Power Stop SwitchSetting the DRY, Cool Batch and Unload Timers Setting the OUT Grain TimerElectronic Monitoring Control System Turning on Electronic Monitoring Control SystemUtilizing Bushel Counter Setting the Load Unload DelaysDryer Safety Circuit Safety Circuit Shutdown Messages Dryer PRE Start Checks PRE Season InspectionTWO Speed Operation Load AugerONE Speed Operation Metering Roll OperationBurner Safety Burner Test Fire Emergency Staged Batch Check Dryer Shutdown Continuous Flow and Continuous Batch Start UP Procedure Turn the control power switch to onDryer Start UP Continuous Flow OperationFull Heat Series Continuous Flow Metering Roll SettingsDryer Start UP & Operation Continuous Flow Metering Roll Settings Dry & CoolStaged Batch Operation Staged Batch FAN & Heater Switch Settings Matically shut down during the cooling and unloading cyclesSeries Batch Timer Settings Full Heat Dry & CoolSeries Staged Batch Timer Settings Series Service Guide Lube Procedures ServiceSeasonal Inspection and Service Suggested Lubricants Insulation Class Consistency Type Grease Frame TypeClearance Holes FAN Propellor Removal and InstallationThreaded Bushing Holes FAN Motor Removal and Installation Heater Parts Removal and Installation Metering Roll Servicing Main ControlsService Tool HOW to Determine a Metering Roll ProblemHOW to Clear a Jammed Metering Roll Series Wiring Diagrams INPUT/OUTPUT Board Terminal Identification Series Wiring to Control BOX Series Control Wiring Series Safety Wiring Diagram Series Front Panel Internal Wiring Series Front Panel External Wiring Dryer FAN can Control Wiring Series 220 Volt Single Phase Control Wiring Series 220 Volt 3 Phase Power Wiring Series 440 Volt 3 Phase Power Wiring Trouble Analysis Procedure Problem Possible CauseDisplay shows Burner 1, 2 or 3 Warning Flame May not be turning. The air switch may need adjustment Problem Possible Cause Trouble Analysis Procedure Change the marquee on the LCD dis- play Press the enter button when desired setting is reachedQuick Reference Guide Page