Airstream
PNEG-343
service manual
INPUT/OUTPUT Board Terminal Identification
Series Wiring Diagrams
Setting the OUT Grain Timer
Safety Alert Symbol
Series Wiring to Control BOX
Warranty
Problem Possible Cause
Lube Procedures
Safety Precautions
Safety
Control Power Switch
Page 34
1300 SERIES WIRING DIAGRAMS
INPUT/OUTPUT BOARD TERMINAL IDENTIFICATION
34
Page 33
Page 35
Image 34
Page 33
Page 35
Contents
Ryer Operation
Page
Series Dryer Operation and Service
Table of Contents
Warranty
Safety Alert Decals
Safety First
Safety Alert Symbol
Careful Operator Is the Best Insurance Against AN Accident
Safety Alert Decals
Safety Precautions
Keep the Dryer Clean Do not Allow Fine
Moisture Control Thermostat
Moisture Control Switch
Dryer Control Panel
Information regarding dryer operation
Load Auger Switch
Control Power Switch
Drying Mode Switch
FAN Switches
Dryer Power Start Switch
Dryer Power Stop Switch
Electronic Monitoring Control System
Setting the DRY, Cool Batch and Unload Timers
Setting the OUT Grain Timer
Turning on Electronic Monitoring Control System
Dryer Safety Circuit
Setting the Load Unload Delays
Utilizing Bushel Counter
Safety Circuit Shutdown Messages
Dryer PRE Start Checks
PRE Season Inspection
ONE Speed Operation
TWO Speed Operation
Load Auger
Metering Roll Operation
Burner Safety
Burner Test Fire
Dryer Shutdown
Staged Batch Check
Emergency
Dryer Start UP
Continuous Flow and Continuous Batch Start UP Procedure
Turn the control power switch to on
Continuous Flow Operation
Dryer Start UP & Operation
Series Continuous Flow Metering Roll Settings
Full Heat
Continuous Flow Metering Roll Settings
Dry & Cool
Staged Batch Operation
Staged Batch FAN & Heater Switch Settings
Matically shut down during the cooling and unloading cycles
Series Batch Timer Settings
Full Heat Dry & Cool
Series Staged Batch Timer Settings
Series Service Guide
Seasonal Inspection and Service
Service
Lube Procedures
Suggested Lubricants
Insulation Class Consistency Type Grease Frame Type
Threaded Bushing Holes
FAN Propellor Removal and Installation
Clearance Holes
FAN Motor Removal and Installation
Heater Parts Removal and Installation
Metering Roll Servicing
Main Controls
HOW to Clear a Jammed Metering Roll
HOW to Determine a Metering Roll Problem
Service Tool
Series Wiring Diagrams
INPUT/OUTPUT Board Terminal Identification
Series Wiring to Control BOX
Series Control Wiring
Series Safety Wiring Diagram
Series Front Panel Internal Wiring
Series Front Panel External Wiring
Dryer FAN can Control Wiring
Series 220 Volt Single Phase Control Wiring
Series 220 Volt 3 Phase Power Wiring
Series 440 Volt 3 Phase Power Wiring
Trouble Analysis Procedure
Problem Possible Cause
Display shows Burner 1, 2 or 3 Warning Flame
May not be turning. The air switch may need adjustment
Problem Possible Cause
Trouble Analysis Procedure
Quick Reference Guide
Press the enter button when desired setting is reached
Change the marquee on the LCD dis- play
Page
Related pages
Troubleshooting for LG Electronics AT6400
Specifications for Kaito electronic KA009R
System Error Message for Belkin PM11-EC/RAMA
Software Flowchart for Toshiba T6963C
HOW to PUT on the Chest Pulse Sensor for NordicTrack NTL25530
Prepare Mounting HOLE, Assemble Faucet and Install for Sears RO 2000
P61A-2 Parts List for Harman Stove Company P61A-2
Error Code List for Mitsubishi Electronics FR-A700
What type of
RJ45 connector
is required for the SLC8 Card?
Top
Page
Image
Contents