2.Reassembly Instructions For Dryers Shipped In Three (3) Pieces
When the dryer is shipped in three (3) pieces, the tumbler and the tumbler base sections are shipped as two (2) separate pieces. The heat console section is shipped as the third piece.
a.Reassemble The Tumbler (Basket) Base Section To The Heat Console Section
Move the heat console section into position by using cables through the eye bolts located at the top of the section or by using a fork truck and lifting the section from underneath. The tumbler (basket) base section is now moved into position with a fork (lift) truck. The seven (7) clearance holes located on the right side of the tumbler (basket) base section (four [4] holes in front and three [3] at the back of the section) must be aligned with the seven (7)
b.Reassemble The Tumbler (Basket) Section Over The Tumbler (Basket) Base
Slowly lower the tumbler (basket) section over the tumbler base. The four (4) large slots located on the bottom of the tumbler (basket) section (one slot at each corner of the tumbler [basket] section) must be aligned with the top of the pistons in the tumbler base section. Use the four (4)
c.Reattach The Control Pendant Arm
Position the control pendant arm to the top front of the heat console section by aligning the clearance holes in the arm with the
d.Reconnect The Internal Air, Electric Connections, and Water Connections (refer to page 12 through page 18).
3.Reassembly Instructions for Dryer Shipped in Four Pieces
In this method of shipment the tumbler section, tumbler (basket) base, lower heat console, and upper heat console are ALL shipped as separate sections.
a.Reassemble The Heat Console Section
Apply silicone (provided with unit) to the flanges of the lower heat console section. Lift the upper heat console section by use of cables through the eyebolts located on the top of the upper console section. Position the upper heat console over the lower heat console section. Use the
b.Reassemble The Tumbler (basket) Base Section To The Heat Console Section
Move the heat console section into position by using cables through the eyebolts located at the top of the section or by using a fork (lift) truck and lifting the section from underneath. The tumbler (basket) base section is now moved into position with a fork (lift) truck. The seven (7) clearance holes located on the right side of the tumbler (basket) base section (four [4] holes in the front and the three [3] at the back of the section) must be aligned with the seven
9